Austin Electrical Permit Leads: Aug 31–Sep 6, 2026

From Monday, Aug 31 through Sunday, Sep 6, 2026, 41 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 1 plan review case and 7 issued permits rate Strong or Medium for Electrical work.

This archived issue is ranked for Electrical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Sep 4.

Austin Permit Leads · Weekly Digest

Week of Aug 31–Sep 6, 2026

41 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Week of Aug 31–Sep 6

Issued Permits: Week of Aug 31–Sep 6

1. Commercial remodel

New this week (applied Sep 1)
Remodel · applied Sep 1 · Approved as of Oct 23, 2026
Electrical: Medium fit · score 40

Interior renovation of an existing Universal Technical Institute occupied space. New work to include new utilities required to support new electrical training equipment.…

Civil engineer (site plan): Kimley-Horn and Associates (from 2021 site plan SP-98-0002C(R2))
View on City of Austin AB+C Portal

2. Temporary jobsite trailer

New this week (applied Sep 1)
New · applied Sep 1 · Approved as of Oct 28, 2026 · 1,500 SF
Electrical: Low fit · score 39

Temporary Office/Jobsite Trailer - no public access - no plumbing ATTN ELEC INSP: REVISED PANEL SCHEDULE AND LOAD CALC FOR PANEL SUPPLYING TRAILER REQUIRED

Owner/Developer: Capital Metropolitan Transportation Authority
View on City of Austin AB+C Portal

3. Change of use to indoor recreation center

Moved to Awaiting Update - Fees Due Sep 3
Remodel · applied Aug 3 · Awaiting Update - Fees Due · 33,878 SF · $2.3M est. (TDLR filing)
Electrical: Low fit · score 38

Interior Remodel and Change of Use from Retail to Indoor Recreation Center (33,878 SF)

Architect/Engineer: Stantec Consulting Services, Inc (from 2021 site plan SP-2021-0036C)
Architect/Engineer: Red Architecture, LLC (from TDLR filing)
Permit expediter: Mercury Permits
View on City of Austin AB+C Portal

4. Office space remodel

New this week (applied Sep 4)
Remodel · applied Sep 4 · Approved as of Oct 14, 2026 · $2M est. (TDLR filing)
Electrical: Low fit · score 37

Interior remodel to existing admin office including access control and associate MEP scopes. No change of use

Permit expediter: Waterloo512
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

5. Commercial remodel

New this week (applied Sep 1)
Remodel · applied Sep 1 · Approved as of Sep 4, 2026
Electrical: Low fit · score 35

Installation of a new roof top solar PV system 44.625 Kw DC and interconnection to the existing service

Applicant: Harvest Solar INC
View on City of Austin AB+C Portal

1. Car dealership remodel

Permit issued Aug 31
Remodel · 16,809 SF · $6M est. (TDLR filing) · issued Aug 31
Electrical: Medium fit · score 63

Phase 2 Renovation of an existing dealership service advisor customer lounge cafe offices and new vehicle delivery. Phase 2 to Include Mechanical Electrical and fire suppression work. ** Rev #1 - Phase 2 DA-2023-1556 - Approved This project will be done in…

GC or design-builder: Navcon Group, LLC
View on City of Austin AB+C Portal

2. New building

Permit issued Sep 1
New · $50K · issued Sep 1
Electrical: Medium fit · score 50

Installation of two (2) light posts for security lighting around the playground in the park. 2026-038815 DA.

GC or design-builder: Austin Parks and Recreation
View on City of Austin AB+C Portal

3. 9-story apartment building

Permit issued Sep 6
New · $10.1M · issued Sep 6
Electrical: Medium fit · score 48

New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story…

GC or design-builder: DMJ Construction Services LLC
View on City of Austin AB+C Portal

4. Office space remodel

Permit issued Sep 4
Remodel · 1,500 SF · issued Sep 4
Electrical: Medium fit · score 48

Interior remodel admin areas at existing telecom facility - lighting and HVAC only.

GC or design-builder: The Beck Group
View on City of Austin AB+C Portal

5. Commercial remodel

Permit issued Sep 1
Remodel · 3,879 SF · issued Sep 1
Electrical: Medium fit · score 46

SMALL PROJECT - Interior remodel of existing tenant space. Expanding the interior suite size. No change of use. Minor Electrical scope shown on A100 A103 and A104 and signed off by Master Electrician. No access control

GC or design-builder: Fore Construction Inc
View on City of Austin AB+C Portal

+36 more plan review cases in the full issue

+50 more issued permits in the full issue

How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for the week of Aug 31–Sep 6, 2026.

Start Your Free Trial
Austin Permit Leads · Daily Recap

Friday, Sep 4, 2026

7 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 11 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Fri, Sep 4

Issued Permits: Fri, Sep 4

1. Office space remodel

New today (applied Sep 4)
Remodel · applied Sep 4 · Approved as of Oct 14, 2026 · $2M est. (TDLR filing)
Electrical: Low fit · score 37

Interior remodel to existing admin office including access control and associate MEP scopes. No change of use

Permit expediter: Waterloo512
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

2. Change of use to office building

Moved to Awaiting Update Sep 4
Remodel · applied Aug 6 · Awaiting Update
Electrical: Low fit · score 18

Change of use and an interior remodel to create an office

Owner/Developer: Trinity WAY LLC
Permit expediter: KS Permitting LLC
View on City of Austin AB+C Portal

3. Convenience store remodel

New today (applied Sep 4)
Remodel · applied Sep 4 · Awaiting Update
Electrical: Low fit · score 18

Finish Out to create C-Store SP2023-1000C.010 -SP

Applicant: City of Austin (from site plan SP-2023-1000C.014C.CC)
Permit expediter: Bennett Consulting
View on City of Austin AB+C Portal

4. Change of use to adult care services

New today (applied Sep 4)
Remodel · applied Sep 4 · Approved as of Sep 22, 2026
Electrical: Low fit · score 5

Change of use: Office/Business to Adult Care Services; no construction

No company contact in the City data.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

5. Hospital remodel

New today (applied Sep 4)
Remodel · applied Sep 4 · Approved as of Sep 11, 2026
Electrical: Low fit · score 0

Reroof - emergency department and postpartum. Existing hospital

Owner/Developer: St Davids Healthcare
View on City of Austin AB+C Portal

1. 9-story apartment building

Permit issued Sep 4
New · $10.1M · issued Sep 4
Electrical: Medium fit · score 48

New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C

GC or design-builder: DMJ Construction Services LLC
View on City of Austin AB+C Portal

2. Office space remodel

Permit issued Sep 4
Remodel · 1,500 SF · issued Sep 4
Electrical: Medium fit · score 48

Interior remodel admin areas at existing telecom facility - lighting and HVAC only.

GC or design-builder: The Beck Group
View on City of Austin AB+C Portal

3. Commercial remodel

Permit issued Sep 4
Remodel · 24,273 SF · $7.5M est. (TDLR filing) · issued Sep 4
Electrical: Medium fit · score 42

Interior Non-Structural Finish Out

GC or design-builder: Novo Construction
View on City of Austin AB+C Portal

4. Office space remodel

Permit issued Sep 4
Remodel · 16,467 SF · issued Sep 4
Electrical: Low fit · score 33

Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin

GC or design-builder: Tryggr Roofing & Construction LLC
View on City of Austin AB+C Portal

5. New building

Permit issued Sep 4
New · $100K · issued Sep 4
Electrical: Low fit · score 20

New construction of an Level 8 swimming pool at approved site.

GC or design-builder: Fun N Sun Pools of Austin, Inc
View on City of Austin AB+C Portal

+2 more plan review cases in the full issue

+8 more issued permits in the full issue

How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for Friday, Sep 4, 2026.

Start Your Free Trial

Daily Recap Spreadsheet Preview

Daily Recap Feature
Plan Review or Issued PermitAddress / ProjectWorkValuationCompanyFit (Electrical)
Plan ReviewOffice space remodelRemodel$2M est. (TDLR filing)N/ALow
Plan ReviewChange of use to office buildingRemodelN/ATrinity WAY LLCLow
Plan ReviewConvenience store remodelRemodelN/ACity of AustinLow
Plan ReviewChange of use to adult care servicesRemodelN/AN/ALow
Plan ReviewHospital remodelRemodelN/ASt Davids HealthcareLow
Issued Permit9-story apartment buildingNew$10.1MDMJ Construction Services LLCMedium

A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.

← Previous WeekAll WeeksNext Week →

Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.