1. Change of use to indoor recreation center
Interior Remodel and Change of Use from Retail to Indoor Recreation Center (33,878 SF)
Architect/Engineer: Red Architecture, LLC (from TDLR filing)
Permit expediter: Mercury Permits
From Monday, Aug 31 through Sunday, Sep 6, 2026, 41 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 0 plan review cases and 1 issued permit rate Strong or Medium for Fire Sprinkler / Alarm work.
This archived issue is ranked for Fire Sprinkler / Alarm work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Sep 4.
41 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel and Change of Use from Retail to Indoor Recreation Center (33,878 SF)
New Construction of Valvoline Instant Oil Change with Lube Pit
Landing Repair At Rear Of Building 8559. Like For Like Replacement Of Aged Materials. Existing multifamily
First Generation Tenant Improvement. Proposed gym use
Temporary Office/Jobsite Trailer - no public access - no plumbing ATTN ELEC INSP: REVISED PANEL SCHEDULE AND LOAD CALC FOR PANEL SUPPLYING TRAILER REQUIRED
New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story…
Interior Non-Structural Finish Out
Finish out of an existing shell space for medical office
New Ground up Shell Building and Interior Grocery Store.
Addition and Change of Use from Transportation Terminal to Restaurant (2131 SF).
+36 more plan review cases in the full issue
+50 more issued permits in the full issue
How fit is scored for fire sprinkler and alarm work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (hotels, apartments, schools, medical and assembly need sprinklers and alarm) and explicit sprinkler or alarm wording. Strong needs real size (20,000+ SF) or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 31–Sep 6, 2026.
Start Your Free Trial7 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 11 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Finish Out to create C-Store SP2023-1000C.010 -SP
Interior remodel to existing admin office including access control and associate MEP scopes. No change of use
Change of use and an interior remodel to create an office
Change of use: Office/Business to Adult Care Services; no construction
Reroof - emergency department and postpartum. Existing hospital
New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C
Interior Non-Structural Finish Out
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin
New construction of an Level 8 swimming pool at approved site.
addition and renovations at o Henry Middle School
+2 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for fire sprinkler and alarm work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (hotels, apartments, schools, medical and assembly need sprinklers and alarm) and explicit sprinkler or alarm wording. Strong needs real size (20,000+ SF) or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Sep 4, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Fire Sprinkler / Alarm) |
|---|---|---|---|---|---|
| Plan Review | Convenience store remodel | Remodel | N/A | City of Austin | Low |
| Plan Review | Office space remodel | Remodel | $2M est. (TDLR filing) | N/A | Low |
| Plan Review | Change of use to office building | Remodel | N/A | Trinity WAY LLC | Low |
| Plan Review | Change of use to adult care services | Remodel | N/A | N/A | Low |
| Plan Review | Hospital remodel | Remodel | N/A | St Davids Healthcare | Low |
| Issued Permit | 9-story apartment building | New | $10.1M | DMJ Construction Services LLC | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.