1. Change of use to indoor recreation center
Interior Remodel and Change of Use from Retail to Indoor Recreation Center (33,878 SF)
Architect/Engineer: Red Architecture, LLC (from TDLR filing)
Permit expediter: Mercury Permits
From Monday, Aug 31 through Sunday, Sep 6, 2026, 41 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 1 plan review case and 0 issued permits rate Strong or Medium for Signage work.
This archived issue is ranked for Signage work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Sep 4.
41 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel and Change of Use from Retail to Indoor Recreation Center (33,878 SF)
Temporary Office/Jobsite Trailer - no public access - no plumbing ATTN ELEC INSP: REVISED PANEL SCHEDULE AND LOAD CALC FOR PANEL SUPPLYING TRAILER REQUIRED
Interior Remodel to Existing Retail Store (3736 SF)
New Construction of Valvoline Instant Oil Change with Lube Pit
New Tenant Finish out and change of use for Taqueria De Diez Restaurant in existing commercial space in downtown Austin
Interior Non-Structural Finish Out
Finish out of an existing shell space for medical office
New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story…
New Ground up Shell Building and Interior Grocery Store.
Exterior facade remodel of existing retail strip center. No modifications being made to any site work landscape building envelopes interiors or occupancies.
+36 more plan review cases in the full issue
+50 more issued permits in the full issue
How fit is scored for signage work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit sign wording (signs, monument, pylon, wayfinding). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 31–Sep 6, 2026.
Start Your Free Trial7 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 11 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Finish Out to create C-Store SP2023-1000C.010 -SP
Change of use and an interior remodel to create an office
Interior remodel to existing admin office including access control and associate MEP scopes. No change of use
Reroof - emergency department and postpartum. Existing hospital
Remodel at existing community college facility. Replace exterior exit stairs
Interior Non-Structural Finish Out
New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin
New construction of an Level 8 swimming pool at approved site.
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 3 Fuel
+2 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for signage work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit sign wording (signs, monument, pylon, wayfinding). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Sep 4, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Signage) |
|---|---|---|---|---|---|
| Plan Review | Convenience store remodel | Remodel | N/A | City of Austin | Low |
| Plan Review | Change of use to office building | Remodel | N/A | Trinity WAY LLC | Low |
| Plan Review | Office space remodel | Remodel | $2M est. (TDLR filing) | N/A | Low |
| Plan Review | Hospital remodel | Remodel | N/A | St Davids Healthcare | Low |
| Plan Review | Commercial remodel | Remodel | $327K est. (TDLR filing) | N/A | Low |
| Issued Permit | Commercial remodel | Remodel | $7.5M est. (TDLR filing) | Novo Construction | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.