1. Commercial remodel
Interior Remodel to Existing Garage Space. Scope of work includes removal of exterior windows for new garage doors with metal ramps annd stairs. New F
From Monday, Aug 31 through Sunday, Sep 6, 2026, 41 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 4 plan review cases and 15 issued permits rate Strong or Medium for Doors & Hardware work.
This archived issue is ranked for Doors & Hardware work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Sep 4.
41 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel to Existing Garage Space. Scope of work includes removal of exterior windows for new garage doors with metal ramps annd stairs. New F
Interior Remodel and Change of Use from Retail to Indoor Recreation Center (33,878 SF)
New Construction of Valvoline Instant Oil Change with Lube Pit
Interior Remodel to Existing Retail Store (3736 SF)
Temporary Office/Jobsite Trailer - no public access - no plumbing ATTN ELEC INSP: REVISED PANEL SCHEDULE AND LOAD CALC FOR PANEL SUPPLYING TRAILER REQUIRED
SMALL PROJECT - Build out of approximately 4060 sq ft one story building for mercantile use. demo of interior walls. new build out includes partition doors mill work finishes and all associated mechanical work at existing mercantile store -OVA
Interior Non-Structural Finish Out
New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story…
ePlan: Expedited Review - Finish-Outs for Units on Level 55 with Roof Terrace (16551 SF)
Interior remodel existing admin areas. Scope does not overlap with 2024-063139 BP
+36 more plan review cases in the full issue
+50 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 31–Sep 6, 2026.
Start Your Free Trial7 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 11 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Change of use and an interior remodel to create an office
Interior remodel to existing admin office including access control and associate MEP scopes. No change of use
Finish Out to create C-Store SP2023-1000C.010 -SP
Reroof - emergency department and postpartum. Existing hospital
Remodel at existing community college facility. Replace exterior exit stairs
Interior Non-Structural Finish Out
New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C
FREIGHT ELEVATOR INCREASING THE ELEVATOR DOOR OPENING FROM 8 TO 10 ON ALL FLOORS 1-4 OF SECTOR 3.
New construction of an Level 8 swimming pool at approved site.
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin
+2 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Sep 4, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Doors & Hardware) |
|---|---|---|---|---|---|
| Plan Review | Change of use to office building | Remodel | N/A | Trinity WAY LLC | Low |
| Plan Review | Office space remodel | Remodel | $2M est. (TDLR filing) | N/A | Low |
| Plan Review | Convenience store remodel | Remodel | N/A | City of Austin | Low |
| Plan Review | Hospital remodel | Remodel | N/A | St Davids Healthcare | Low |
| Plan Review | Commercial remodel | Remodel | $327K est. (TDLR filing) | N/A | Low |
| Issued Permit | Commercial remodel | Remodel | $7.5M est. (TDLR filing) | Novo Construction | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.