1. Commercial remodel
Interior demo of interior wall and ductwork, Install hydraulic lift, shelving and racking
From Monday, Aug 31 through Sunday, Sep 6, 2026, 41 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 1 plan review case and 10 issued permits rate Strong or Medium for HVAC / Mechanical work.
This archived issue is ranked for HVAC / Mechanical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Sep 4.
41 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior demo of interior wall and ductwork, Install hydraulic lift, shelving and racking
Interior remodel to existing admin office including access control and associate MEP scopes. No change of use
Interior Remodel and Change of Use from Retail to Indoor Recreation Center (33,878 SF)
First Generation Tenant Improvement. Proposed gym use
Temporary Office/Jobsite Trailer - no public access - no plumbing ATTN ELEC INSP: REVISED PANEL SCHEDULE AND LOAD CALC FOR PANEL SUPPLYING TRAILER REQUIRED
Phase 2 Renovation of an existing dealership service advisor customer lounge cafe offices and new vehicle delivery. Phase 2 to Include Mechanical Electrical and fire suppression work. ** Rev #1 - Phase 2 DA-2023-1556 - Approved This project will be done in…
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin
SMALL PROJECT - Build out of approximately 4060 sq ft one story building for mercantile use. demo of interior walls. new build out includes partition doors mill work finishes and all associated mechanical work at existing mercantile store -OVA
New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story…
Vent hood installation + adding gas equipment into the kitchen.
+36 more plan review cases in the full issue
+50 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 31–Sep 6, 2026.
Start Your Free Trial7 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 11 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior remodel to existing admin office including access control and associate MEP scopes. No change of use
Change of use and an interior remodel to create an office
Finish Out to create C-Store SP2023-1000C.010 -SP
Change of use: Office/Business to Adult Care Services; no construction
Reroof - emergency department and postpartum. Existing hospital
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin
New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C
Interior remodel admin areas at existing telecom facility - lighting and HVAC only.
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 3 Fuel
Interior Non-Structural Finish Out
+2 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Sep 4, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (HVAC / Mechanical) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | $2M est. (TDLR filing) | N/A | Low |
| Plan Review | Change of use to office building | Remodel | N/A | Trinity WAY LLC | Low |
| Plan Review | Convenience store remodel | Remodel | N/A | City of Austin | Low |
| Plan Review | Change of use to adult care services | Remodel | N/A | N/A | Low |
| Plan Review | Hospital remodel | Remodel | N/A | St Davids Healthcare | Low |
| Issued Permit | Office space remodel | Remodel | N/A | Tryggr Roofing & Construction LLC | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.