1. New building
New Construction of Valvoline Instant Oil Change with Lube Pit
From Monday, Aug 31 through Sunday, Sep 6, 2026, 41 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 1 plan review case and 11 issued permits rate Strong or Medium for Roofing work.
This archived issue is ranked for Roofing work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Sep 4.
41 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of Valvoline Instant Oil Change with Lube Pit
Temporary Office/Jobsite Trailer - no public access - no plumbing ATTN ELEC INSP: REVISED PANEL SCHEDULE AND LOAD CALC FOR PANEL SUPPLYING TRAILER REQUIRED
Installation of a new roof top solar PV system 44.625 Kw DC and interconnection to the existing service
Re-Roof of metal R-panel roof system, and replacing with a metal R-panel roof system (same color as existing). No structural or insulation improvements
Remove/replace existing roof system as required and install new TPO roofing system. No structural work. No insulation work, no changes to the pitch
AT&T Rooftop/Parking Structure Antenna Collocation. 2026-082218 DA.
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin
ePlan: Expedited Review - Finish-Outs for Units on Level 55 with Roof Terrace (16551 SF)
New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C New construction of multifamily - 3 story…
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 3 Fuel
+36 more plan review cases in the full issue
+50 more issued permits in the full issue
How fit is scored for roofing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit roofing wording (re-roof, roof, TPO, membrane). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 31–Sep 6, 2026.
Start Your Free Trial7 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 11 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Reroof - emergency department and postpartum. Existing hospital
Remodel at existing community college facility. Replace exterior exit stairs
Change of use: Office/Business to Adult Care Services; no construction
REPLACING 4 WINDOWS, like for like, IN EXISTING RESIDENTIAL SPACE
Change of use and an interior remodel to create an office
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 1 Admin
New construction of multifamily - 3 story residences over 2 story parking - total 5 stories Bldgs A B and C
Remove existing PVC and fanfold cover board down to original BUR mechanically attach fan fold and 50mil single-ply PVC membrane 3 Fuel
New construction of an Level 8 swimming pool at approved site.
Reroof overlay with totally adhered Carlisle TPO
+2 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for roofing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit roofing wording (re-roof, roof, TPO, membrane). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Sep 4, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Roofing) |
|---|---|---|---|---|---|
| Plan Review | Hospital remodel | Remodel | N/A | St Davids Healthcare | Low |
| Plan Review | Commercial remodel | Remodel | $327K est. (TDLR filing) | N/A | Low |
| Plan Review | Change of use to adult care services | Remodel | N/A | N/A | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Change of use to office building | Remodel | N/A | Trinity WAY LLC | Low |
| Issued Permit | Office space remodel | Remodel | N/A | Tryggr Roofing & Construction LLC | Medium |