1. 5-story hotel
Proposed construction of a new five-story hotel utilizing type ii-a construction over a traditional slab on grade concrete foundation
From Monday, Sep 7 through Sunday, Sep 13, 2026, 44 commercial projects entered or moved through City of Austin plan review and 33 commercial building permits were issued. 6 plan review cases and 8 issued permits rate Strong or Medium for Electrical work.
This archived issue is ranked for Electrical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Sep 11.
44 commercial projects in city plan review and 33 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 23 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Proposed construction of a new five-story hotel utilizing type ii-a construction over a traditional slab on grade concrete foundation
Replace interior flooring throughout, replace plumbing fixtures, replace 2 storefront windows, fix exterior drainage issues, envelope maintenance, and minor electrical…
Change of Use from Office to Retail and interior Remodel of an Existing space includes new lighting for a retail sports and collector cards occupancy. - Approved ATTN…
Change of use from B (Admin/ Professional Offices) to Education for private school use. ATTN ELEC INSP Revised Panel Schedule and Load Calculation Required
Interior finish out. All structural beams, joists, columns etc to remain. Existing electrical service to the space to remain. New finishes, fixtures, and equipment to be…
Previously permitted under 2022-113622 PR with CO-Shell. First time finish out. This request is for occupancy only no new construction. Per instruction from Mark McLendon and Glenn Rhoades no Site Plan Exemption required (as SP shows factory/warehouse) and 5…
Pre Fabricated Kitchen (multi-apps (8) 2026-023648 FR FIELD INSPECT ELECTRICAL
CHANGE OF USE to Retail Sports: Interior remodel of an existing space including new lighting for a retail sports and collector cards occupancy. 2026 097978 DA - Approved
Interior build-back and restoration of two fire-damaged apartment units. Replacement of drywall insulation finishes cabinetry flooring doors windows electrical plumbing and HVAC components as required. No change to building footprint or structural framing.…
Interior Remodel for a suite expansion including reconfiguration of walls and doors new finishes ceilings and lighting for Suite 150
+39 more plan review cases in the full issue
+28 more issued permits in the full issue
How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Sep 7–13, 2026.
Start Your Free Trial12 commercial projects in city plan review and 10 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 7 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Change of Use from Office to Retail and interior Remodel of an Existing space includes new lighting for a retail sports and collector cards occupancy. - Approved ATTN…
Interior Remodel and Change of Use from Personal Services to Storage for Retail Store (suite 2700), Suite 2700 Scope will Include Interior remodel (16,790 SF)
Interior remodel existing office areas - Phase 1 and 2 (2 apps)
Interior alteration of approx. (6,400 sf) of existing interior space
Interior alteration of approx. 4100 SF of existing interior space. (Floor 27)
Pre Fabricated Kitchen (multi-apps (8) 2026-023648 FR FIELD INSPECT ELECTRICAL
Interior remodel - demolition construction of new ceilings finishes mechanical. electrical and plumbing as indicated on drawings. (Floor 2) Interior remodel - demolition construction of new ceilings finishes mechanical. (Floor 3) Interior remodel - demolition…
New Construction of a 6261 sf Convenience Store Construction of 16 VFP Fueling Canopy
Interior remodel of existing office space. (2 Apps - Suite 420 and 430) Interior remodel of existing office space. (2 Apps - Suite 420 and 430)
Finish out for admin office
+7 more plan review cases in the full issue
+5 more issued permits in the full issue
How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Sep 11, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Electrical) |
|---|---|---|---|---|---|
| Plan Review | Change of use to retail space | Remodel | N/A | Kimley Horn and Associates | Medium |
| Plan Review | Change of use to retail space | Remodel | N/A | Thrower Design | Low |
| Plan Review | Office space remodel | Remodel | $1.5M est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $165K est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $295K est. (TDLR filing) | N/A | Low |
| Issued Permit | New building | New | $15M est. (TDLR filing) | N/A | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.