1. Car dealership with repair garage
EPLAN PROJECT: New car dealership (31,587 sqft), New repair garage 1st floor and parking garage 2nd through 5th floor (175,014 sqft), and New gas generator and trash…
Permit expediter: Austin Permit Service Inc
From Monday, Sep 14 through Sunday, Sep 20, 2026, 50 commercial projects entered or moved through City of Austin plan review and 60 commercial building permits were issued. 7 plan review cases and 9 issued permits rate Strong or Medium for Electrical work.
This archived issue is ranked for Electrical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Sep 18.
50 commercial projects in city plan review and 60 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 50 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
EPLAN PROJECT: New car dealership (31,587 sqft), New repair garage 1st floor and parking garage 2nd through 5th floor (175,014 sqft), and New gas generator and trash…
285,000 SF Ground-up construction of a Warehouse with associated site improvements and parking
Interior Remodel and Addition to Existing Community Rec. Scope of Work to Include New Construction of Pool House, Shade Structure over Sports Court, 2-Shade Struct
interior remodel for fitness use on floor 1 ATTN ELEC. INSP.: Readily accessible GFCI Protection RQD for dishwasher Reference 2026 NEC 210.8 (D)(7)
Fire Pump and Electrical meter replacement in existing office/warehouse building
SMALL PROJECT - DEMO OF FINISHES SOME MILLWORK WALLS AND DOORS LIGHT FIXTURES AND REMODEL TO INCLUDE NEW FINISHES WALLS DOORS AND MILLWORK. DEMO AND NEW WORK ALSO INCLUDES MECHANICAL ELECTRICAL AND PLUMBING ASSOCIATED WITH THE ARCHITECTURAL SCOPE OF WORK. AT…
Upgrade existing electrical service to new 600A 120/208V 3 Phase 4-Wire CT-metered service. Replace existing exterior service equipment with new 600A non-fused service disconnect gutter / wireway CT cabinet / service section and 600A CT meter socket.
New Construction of Dining Building for Austin Country Club (20688 SF). New Construction of Fitness Building for Austin Country Club (20688 SF). New Construction of Structured Parking with Tennis Court area on Top for Austin Country Club (20688 SF). New…
Interior renovation of existing office space B occupancy. Removal of existing wall partitions doors frames. Removal of existing ceiling tile and light fixtures. New office configuration open floor plan one conference room one breakroom and reception area
ePlan-Expedited Review: Interior Remodel and Change of Use from Child Daycare to Personal Improvement Service. Scope of work to include demo of flooring fans plumbing fixtures light fixtures update parking stalls to meet zoning requirements (2127 SF)…
+45 more plan review cases in the full issue
+55 more issued permits in the full issue
How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Sep 14–20, 2026.
Start Your Free Trial12 commercial projects in city plan review and 8 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 7 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel and Addition to Existing Community Rec. Scope of Work to Include New Construction of Pool House, Shade Structure over Sports Court, 2-Shade Struct
Fire Pump and Electrical meter replacement in existing office/warehouse building
BAUS Review Replace a Free Standing Cooler (24,300 SF)
Interior tenant finishout of commercial office space less than 5000 sq ft
Interior renovation for Bus/Admin/Prof office and interior renovation to create 11th floor corridor. (2 Apps)
SMALL PROJECT - DEMO OF FINISHES SOME MILLWORK WALLS AND DOORS LIGHT FIXTURES AND REMODEL TO INCLUDE NEW FINISHES WALLS DOORS AND MILLWORK. DEMO AND NEW WORK ALSO INCLUDES MECHANICAL ELECTRICAL AND PLUMBING ASSOCIATED WITH THE ARCHITECTURAL SCOPE OF WORK. AT…
Upgrade existing electrical service to new 600A 120/208V 3 Phase 4-Wire CT-metered service. Replace existing exterior service equipment with new 600A non-fused service disconnect gutter / wireway CT cabinet / service section and 600A CT meter socket.
CHANGE OF USE FROM YMCA TO PILATES STUDIO with interior finish-out of existing tenant suite 103 for a Pilates fitness studio. Interior alterations only non-structure partitions finishes and associated electrical mechanical and plumbing. No increase in…
SMALL PROJECT - Change of Use from Salon to Business Admin Office. Interior remodel with MEP Scope. Access Control requested.
INTERIOR REMODEL -REPLACE ALL MISSING FIREPROOFING AND FIRESTOPPING. AFFECTED BY NEW CONSTRUCTION WITH FIREPROOFING TO MATCH BASE BUILDING EXISTING STANARDS.ALL CONSTRUCTION SHALL BE NON-COMBUSTIBLE. 4. ALL WOOD AND WOOD BLOCKING SHALL BE FIRE RETARDANT…
+7 more plan review cases in the full issue
+3 more issued permits in the full issue
How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Sep 18, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Electrical) |
|---|---|---|---|---|---|
| Plan Review | Addition and remodel | Addition and Remodel | $17M est. (TDLR filing) | WGI | Medium |
| Plan Review | Warehouse remodel | Remodel | N/A | N/A | Medium |
| Plan Review | Free-standing cooler replacement | Remodel | N/A | City of Austin | Low |
| Plan Review | Office space remodel | Remodel | $300K est. (TDLR filing) | N/A | Low |
| Plan Review | Office space remodel | Remodel | $340K est. (TDLR filing) | CL Jones Construction | Low |
| Issued Permit | Office space remodel | Remodel | $135K est. (TDLR filing) | Corco Construction LLC | Strong |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.