1. Industrial building
285,000 SF Ground-up construction of a Warehouse with associated site improvements and parking
From Monday, Sep 14 through Sunday, Sep 20, 2026, 50 commercial projects entered or moved through City of Austin plan review and 60 commercial building permits were issued. 5 plan review cases and 7 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Sep 18.
50 commercial projects in city plan review and 60 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 50 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
285,000 SF Ground-up construction of a Warehouse with associated site improvements and parking
EPLAN PROJECT: New car dealership (31,587 sqft), New repair garage 1st floor and parking garage 2nd through 5th floor (175,014 sqft), and New gas generator and trash…
Interior Remodel and Addition to Existing Community Rec. Scope of Work to Include New Construction of Pool House, Shade Structure over Sports Court, 2-Shade Struct
New retail shell building
Interior Remodel to Existing Restaurant and Addition of a 2 Story Patio (4,420 SF)
New Construction of Dining Building for Austin Country Club (20688 SF). New Construction of Fitness Building for Austin Country Club (20688 SF). New Construction of Structured Parking with Tennis Court area on Top for Austin Country Club (20688 SF). New…
New Construction of Garage for Urbana Yardhomes.
Interior Remodel Change of Use and Addition from Educational to Mix Use; Restaurant Retail and Offices (36068 SF).
SMALL PROJECT - Adding antennas and radios to existing cell tower. Installing concrete pad elevated platform to hold ground equipment and generator.
NEW CONSTRUCTION OF TWO-STORY COMMUNITY ARTS EDUCATIONAL BUILDING. Concurrent Review.
+45 more plan review cases in the full issue
+55 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Sep 14–20, 2026.
Start Your Free Trial12 commercial projects in city plan review and 8 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 7 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel and Addition to Existing Community Rec. Scope of Work to Include New Construction of Pool House, Shade Structure over Sports Court, 2-Shade Struct
BAUS Review Replace a Free Standing Cooler (24,300 SF)
Interior tenant finishout of commercial office space less than 5000 sq ft
Change of use religous services to pet services
Existing Curbside Pick-up Remodel
CHANGE OF USE FROM YMCA TO PILATES STUDIO with interior finish-out of existing tenant suite 103 for a Pilates fitness studio. Interior alterations only non-structure partitions finishes and associated electrical mechanical and plumbing. No increase in…
Upgrade existing electrical service to new 600A 120/208V 3 Phase 4-Wire CT-metered service. Replace existing exterior service equipment with new 600A non-fused service disconnect gutter / wireway CT cabinet / service section and 600A CT meter socket.
Remodel of existing conference rooms to add storefronts. Includes complete renovation of 2 sets of upstairs restrooms and install of new exterior door
SMALL PROJECT - DEMO OF FINISHES SOME MILLWORK WALLS AND DOORS LIGHT FIXTURES AND REMODEL TO INCLUDE NEW FINISHES WALLS DOORS AND MILLWORK. DEMO AND NEW WORK ALSO INCLUDES MECHANICAL ELECTRICAL AND PLUMBING ASSOCIATED WITH THE ARCHITECTURAL SCOPE OF WORK. AT…
Overylay roof with Karnak Silicone Roofing System
+7 more plan review cases in the full issue
+3 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Sep 18, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Plan Review | Addition and remodel | Addition and Remodel | $17M est. (TDLR filing) | WGI | Medium |
| Plan Review | Free-standing cooler replacement | Remodel | N/A | City of Austin | Low |
| Plan Review | Office space remodel | Remodel | $300K est. (TDLR filing) | N/A | Low |
| Plan Review | Change of use to pet services | Remodel | N/A | Cleantag LLC | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Issued Permit | Change of use to fitness center | Remodel | N/A | Lux Painting | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.