1. Medical clinic remodel
Tenant interior renovation of an existing Dialysis clinic. Work includes updating finishes, plumbing, mechanical, electrical, and the addition of a wall to the reception…
From Monday, Mar 9 through Sunday, Mar 15, 2026, 39 commercial projects entered or moved through City of Austin plan review and 58 commercial building permits were issued. 3 plan review cases and 3 issued permits rate Strong or Medium for HVAC / Mechanical work.
This archived issue is ranked for HVAC / Mechanical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 13.
39 commercial projects in city plan review and 58 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 38 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Tenant interior renovation of an existing Dialysis clinic. Work includes updating finishes, plumbing, mechanical, electrical, and the addition of a wall to the reception…
Renovations to existing public elementary school including finishes, reroofing, plumbing fixtures, HVAC, envelope sealing, new theatre curtain at stage and replacement…
Removing a type 2 vent hood and installing a type 1 vent hood.
Interior Remodel to Existing Office (12,307 SF)
The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof curb replacement of RTU-1A, 1B, 1C, 1D, and 2A, and installation of…
Interior renovations to existing building addition of new fire suppression system update mechanical and electrical systems PuPR2
First time interior finish out of office suite for Alamo Drafthouse business headquarters office with Access Control Requested and minor MEP work.
Installing 3 Split HVAC Units for Existing Office Building
Change of Use and Finish Out for Theater and Dance School in Space Previously Retuned to Shell in Phase I scope includes New Exterior Openings for Glazing and Shade Canopies Over Exits. (2025-052228PR) (150000 SF).
Interior Remodel for Core Improvements for Future Finish Out. Not For Occupancy (38623 SF).
+34 more plan review cases in the full issue
+53 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Mar 9–15, 2026.
Start Your Free Trial9 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 9 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Renovations to existing public elementary school including finishes, reroofing, plumbing fixtures, HVAC, envelope sealing, new theatre curtain at stage and replacement…
Interior Remodel to Existing Office (12,307 SF)
Remodel existing 1st floor hospital areas
Interior renovation to create 10th floor corridor and interior renovation for Bus Admin Prof office. (Suite 1020) 2 Apps
7 DAY - Finish out for multi-tenant corridor and restrooms
Interior Remodel for Core Improvements for Future Finish Out. Not For Occupancy (38623 SF).
2026/03/13 - 2026/03/14 | 2 day public event with panels sponsor activations and live music #SFS
Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spaces.Access control plan provided as separate attachments.…
7 day interior remodel of existing office space
2026/03/13 - 2026/03/15 | (2026/03/02) | Music concerts with two days of paid admission and one day of free shows. #SXSWAffiliated 2026/03/13 - 2026/03/15 | (2026/03/02) | Music concerts with two days of paid admission and one day of free shows.…
+4 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Mar 13, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (HVAC / Mechanical) |
|---|---|---|---|---|---|
| Plan Review | School remodel | Remodel | $5.9M est. (TDLR filing) | Round Rock ISD | Medium |
| Plan Review | Office space remodel | Remodel | $108K est. (TDLR filing) | LJA Engineering | Low |
| Plan Review | Hospital remodel | Remodel | N/A | St Davids Healthcare | Low |
| Plan Review | Office space remodel | Remodel | $340K est. (TDLR filing) | CL Jones Construction | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Issued Permit | Commercial remodel | Remodel | $950K est. (TDLR filing) | RCC Associates | Low |