1. Retail building with repair garage
Fuel Canopy for New Construction C Store
Permit expediter: JAG Permits
From Monday, Mar 9 through Sunday, Mar 15, 2026, 39 commercial projects entered or moved through City of Austin plan review and 58 commercial building permits were issued. 0 plan review cases and 0 issued permits rate Strong or Medium for Fire Sprinkler / Alarm work.
This archived issue is ranked for Fire Sprinkler / Alarm work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 13.
39 commercial projects in city plan review and 58 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 38 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Fuel Canopy for New Construction C Store
QT - Minor interior remodel with non-structural kitchen at existing multifamily - OVA
Remodel existing 1st floor hospital areas
Interior Remodel to Existing Office (12,307 SF)
CHANGE OF USE FROM MEDICAL TO RESTAURANT existing one story freestanding building to accommodate a 2005 sq ft Pollo Regio.
2026/03/18 - 2026/03/22 | The SoCo Stomp is a 5-day 50-band party in the parking lot and indoors at C-Boys Heart & Soul. The first day is an official SXSW event. (See last couple years for SXSW affiliation that granted us our 5th day) 2026/03/18…
2026/03/12 - 2026/03/18 | (2026/03/09) | 7 day free public event with pre-registration featuring vehicle demos and concerts #SXSWAffiliated 2026/03/12 - 2026/03/18 | (2026/03/09) | 7 day free public event with pre-registration featuring vehicle demos and…
2026/02/20 - 2026/02/28 | (2026/02/19) | Moms weekend consisting of members and their moms gathering. March madness consists of an event themed for the NCAA march madness tournament. #Greek
2026/03/13 - 2026/03/14 | 2 day public event with panels sponsor activations and live music #SFS 2026/03/13 - 2026/03/14 | 2 day public event with panels sponsor activations and live music #SFS
2026/03/13 | BEG events is producing a walk through immersive gallery on behalf of TV Network Investigation Discovery. This is a one day experience happening on Friday 3/13/26 at Assembly Hall in East Austin. It will be a roughly 20X30 walk through…
+34 more plan review cases in the full issue
+53 more issued permits in the full issue
How fit is scored for fire sprinkler and alarm work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (hotels, apartments, schools, medical and assembly need sprinklers and alarm) and explicit sprinkler or alarm wording. Strong needs real size (20,000+ SF) or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Mar 9–15, 2026.
Start Your Free Trial9 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 9 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Remodel existing 1st floor hospital areas
Interior Remodel to Existing Office (12,307 SF)
Renovations to existing public elementary school including finishes, reroofing, plumbing fixtures, HVAC, envelope sealing, new theatre curtain at stage and replacement…
Interior renovation to create 10th floor corridor and interior renovation for Bus Admin Prof office. (Suite 1020) 2 Apps
7 DAY - Finish out for multi-tenant corridor and restrooms
2026/03/13 - 2026/03/14 | 2 day public event with panels sponsor activations and live music #SFS
Interior Remodel for Core Improvements for Future Finish Out. Not For Occupancy (38623 SF).
2026/03/13 - 2026/03/15 | (2026/03/02) | Music concerts with two days of paid admission and one day of free shows. #SXSWAffiliated 2026/03/13 - 2026/03/15 | (2026/03/02) | Music concerts with two days of paid admission and one day of free shows.…
2026/03/15 - 2026/03/18 | (2026/03/12) | (We order one outside 400sqft booth in SXSW2026 (show date: 12th-18th Mar) #SXSWAffiliated
2026/03/12 - 2026/03/16 | (2026/03/11 - 2026/03/17) | The project involves the temporary installation of window branding for an SXSW-related activation at the venue. The branding consists of adhesive vinyl graphics applied to exterior window surfaces as well…
+4 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for fire sprinkler and alarm work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (hotels, apartments, schools, medical and assembly need sprinklers and alarm) and explicit sprinkler or alarm wording. Strong needs real size (20,000+ SF) or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Mar 13, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Fire Sprinkler / Alarm) |
|---|---|---|---|---|---|
| Plan Review | Hospital remodel | Remodel | N/A | St Davids Healthcare | Low |
| Plan Review | Office space remodel | Remodel | $108K est. (TDLR filing) | LJA Engineering | Low |
| Plan Review | School remodel | Remodel | $5.9M est. (TDLR filing) | Round Rock ISD | Low |
| Plan Review | Office space remodel | Remodel | $340K est. (TDLR filing) | CL Jones Construction | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Issued Permit | New building | New | N/A | N/A | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.