1. Retail building with repair garage
Fuel Canopy for New Construction C Store
Permit expediter: JAG Permits
From Monday, Mar 9 through Sunday, Mar 15, 2026, 39 commercial projects entered or moved through City of Austin plan review and 58 commercial building permits were issued. 1 plan review case and 5 issued permits rate Strong or Medium for Glazing / Storefront work.
This archived issue is ranked for Glazing / Storefront work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 13.
39 commercial projects in city plan review and 58 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 38 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Fuel Canopy for New Construction C Store
Replace exterior doors, windows, siding and asphalt shingle roofing. Repair entry stairs, landings and balconies. Temporarily remove electrical panels and reinstall…
Facade renovation of existing warehouse to shell condition, including demolition of interior partitions, modification of openings in tilt-wall, addition and replacement…
Interior Renovation to accommodate Temporary Offices Rev. 1 scope - glass door to comply with 2024 IECC. - Approved
Interior Remodel to Existing Office (12,307 SF)
Change of Use and Finish Out for Theater and Dance School in Space Previously Retuned to Shell in Phase I scope includes New Exterior Openings for Glazing and Shade Canopies Over Exits. (2025-052228PR) (150000 SF).
Interior demolition of existing gun shop. Demolition of second level and exterior storefront will require permanent structural shoring included in this permit.
Construction of new facility on the same site
TEST CX SURVEY EMAILS IN PROD TEST CX SURVEY EMAILS IN PROD
COTAland Restrooms (MF-13) COTAland - ATR-24 Burn Out.
+34 more plan review cases in the full issue
+53 more issued permits in the full issue
How fit is scored for glazing and storefront work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit glazing wording (storefront, curtain wall, glazing, windows, facade). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Mar 9–15, 2026.
Start Your Free Trial9 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 9 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel to Existing Office (12,307 SF)
Remodel existing 1st floor hospital areas
Installation of 7 new L2 EV chargers in an existing apartment parking garage
Replace skylight translucent panels
Interior renovation to create 10th floor corridor and interior renovation for Bus Admin Prof office. (Suite 1020) 2 Apps
COTAland Restrooms (MF-13) COTAland - ATR-24 Burn Out.
2026/03/13 - 2026/03/15 | (2026/03/02) | Music concerts with two days of paid admission and one day of free shows. #SXSWAffiliated 2026/03/13 - 2026/03/15 | (2026/03/02) | Music concerts with two days of paid admission and one day of free shows.…
2026/03/15 - 2026/03/18 | (2026/03/12) | (We order one outside 400sqft booth in SXSW2026 (show date: 12th-18th Mar) #SXSWAffiliated
2026/03/13 - 2026/03/14 | 2 day public event with panels sponsor activations and live music #SFS
2026/03/12 - 2026/03/16 | (2026/03/11 - 2026/03/17) | The project involves the temporary installation of window branding for an SXSW-related activation at the venue. The branding consists of adhesive vinyl graphics applied to exterior window surfaces as well…
+4 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for glazing and storefront work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit glazing wording (storefront, curtain wall, glazing, windows, facade). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Mar 13, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Glazing / Storefront) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | $108K est. (TDLR filing) | LJA Engineering | Low |
| Plan Review | Hospital remodel | Remodel | N/A | St Davids Healthcare | Low |
| Plan Review | Apartment building remodel with garage | Remodel | N/A | Sage Crossroads, LLC | Low |
| Plan Review | Commercial remodel | Remodel | $100K est. (TDLR filing) | WL Hall | Low |
| Plan Review | Office space remodel | Remodel | $340K est. (TDLR filing) | CL Jones Construction | Low |
| Issued Permit | New building | New | $22K | Diamond One Construction Inc DBA Steelwood Inc | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.