1. Retail building with repair garage
Fuel Canopy for New Construction C Store
Permit expediter: JAG Permits
From Monday, Mar 9 through Sunday, Mar 15, 2026, 39 commercial projects entered or moved through City of Austin plan review and 58 commercial building permits were issued. 3 plan review cases and 5 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 13.
39 commercial projects in city plan review and 58 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 38 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Fuel Canopy for New Construction C Store
Installation of new generator, concrete pad, bollards, and chain link fence enclosure
Installation of 7 new L2 EV chargers in an existing apartment parking garage
The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof curb replacement of RTU-1A, 1B, 1C, 1D, and 2A, and installation of…
Facade renovation of existing warehouse to shell condition, including demolition of interior partitions, modification of openings in tilt-wall, addition and replacement…
Foundation Repair 68 Steel Piers - Bldg 2 Foundation Repair 68 Steel Piers - Bldg 10 Foundation Repair 68 Steel Piers - Bldg. 13 Foundation Repair 68 Steel Piers - Bldg. 16
Temp Shoring in Parking Garage (Floor L3)
Construction of new facility on the same site
TEST CX SURVEY EMAILS IN PROD TEST CX SURVEY EMAILS IN PROD
COTAland Restrooms (MF-13) COTAland - ATR-24 Burn Out.
+34 more plan review cases in the full issue
+53 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Mar 9–15, 2026.
Start Your Free Trial9 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 9 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Installation of 7 new L2 EV chargers in an existing apartment parking garage
Interior Remodel to Existing Office (12,307 SF)
Remodel existing 1st floor hospital areas
Replace skylight translucent panels
Interior renovation to create 10th floor corridor and interior renovation for Bus Admin Prof office. (Suite 1020) 2 Apps
Temp Shoring in Parking Garage (Floor L3)
COTAland Restrooms (MF-13) COTAland - ATR-24 Burn Out.
2026/03/13 - 2026/03/15 | (2026/03/02) | Music concerts with two days of paid admission and one day of free shows. #SXSWAffiliated 2026/03/13 - 2026/03/15 | (2026/03/02) | Music concerts with two days of paid admission and one day of free shows.…
2026/03/15 - 2026/03/18 | (2026/03/12) | (We order one outside 400sqft booth in SXSW2026 (show date: 12th-18th Mar) #SXSWAffiliated
2026/03/13 - 2026/03/14 | 2 day public event with panels sponsor activations and live music #SFS
+4 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Mar 13, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Plan Review | Apartment building remodel with garage | Remodel | N/A | Sage Crossroads, LLC | Medium |
| Plan Review | Office space remodel | Remodel | $108K est. (TDLR filing) | LJA Engineering | Low |
| Plan Review | Hospital remodel | Remodel | N/A | St Davids Healthcare | Low |
| Plan Review | Commercial remodel | Remodel | $100K est. (TDLR filing) | WL Hall | Low |
| Plan Review | Office space remodel | Remodel | $340K est. (TDLR filing) | CL Jones Construction | Low |
| Issued Permit | Parking garage remodel | Remodel | N/A | Western Specialty Contractors | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.