1. Addition, apartment complex with garage
Remodel, addition, and new construction of three existing buildings into a 76-unit multi-family apartment complex. Includes new accessory/amenity spaces, parking garage,…
Permit expediter: Mercury Permits
From Monday, Mar 2 through Sunday, Mar 8, 2026, 54 commercial projects entered or moved through City of Austin plan review and 41 commercial building permits were issued. 5 plan review cases and 7 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 6.
54 commercial projects in city plan review and 41 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 27 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Remodel, addition, and new construction of three existing buildings into a 76-unit multi-family apartment complex. Includes new accessory/amenity spaces, parking garage,…
New Construction of Client Housing (28,106 SF)
46,000 SF of Level I and II interior renovations (IEBC) to an existing building for Round Rock ISD & minor site improvements
Unit 1 - Restroom and pavilion - single story restroom. Unit 2 - Picnic pavilion smaller shaded area for gathering, open on all 4 sides. Unit 3 - Picnic pavilion -…
Rebuild of a pawn shop on existing site (bldg destroyed by fire)
Remodel Two Bungalows- Scope of work to Include Exterior rehab Interior Demolition Addition to Include Connecting Bungalows into a Single Shell for Future Restaurant (2920 SF).
SMART HOUSING - Swimming Pool.
New commercial pool
New Construction Swimming Pool.
New Construction Shell Warehouse for Building 2.
+49 more plan review cases in the full issue
+36 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Mar 2–8, 2026.
Start Your Free Trial14 commercial projects in city plan review and 3 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 2 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
A 6773 SF tenant finish out for an office, not sprinkled with no site improvements
CHANGE OF USE FROM RETAIL TO BILLIARD The project includes electrical and plumbing installations meeting City of Austin codes and Plumbing Install supply and drainage…
Qt - dumpster enclosure at new gas station. gast station and other structures permitted seperatly - ova
Simple re-roof - ova
Simple re-roof - ova
7 DAY - INTERIOR ALTERATION OF APPROX ( 7678 SF) OF EXISTING INTERIOR SPACE. - OVA
Interior renovation of office suite. Access Control plans included.
Interior remodel to existing business office suite. No access control.
+9 more plan review cases in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Mar 6, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | $300K est. (TDLR filing) | N/A | Low |
| Plan Review | Change of use to billiard the project includes | Remodel | N/A | N/A | Low |
| Plan Review | Convenience store remodel | Remodel | $150K est. (TDLR filing) | Professional StruCIVIL Engineers, Inc | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $110K est. (TDLR filing) | N/A | Low |
| Issued Permit | Commercial remodel | Remodel | $600K est. (TDLR filing) | Fore Construction Inc | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.