1. School remodel
AISD Hart Elementary School in Austin: project involves Renovating two existing classrooms for a new use, including updated finishes, new walls, and selective HVAC and…
From Monday, Mar 2 through Sunday, Mar 8, 2026, 54 commercial projects entered or moved through City of Austin plan review and 41 commercial building permits were issued. 5 plan review cases and 4 issued permits rate Strong or Medium for HVAC / Mechanical work.
This archived issue is ranked for HVAC / Mechanical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 6.
54 commercial projects in city plan review and 41 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 27 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
AISD Hart Elementary School in Austin: project involves Renovating two existing classrooms for a new use, including updated finishes, new walls, and selective HVAC and…
Interior Remodel to Convert Building into a Commercial Production Kitchen and Warehousing Facility. Phase 2 to Include Prep Areas, Cooking, Vent Hood Ar
New Lab Exhaust installation for existing hospital
Update cosmetic existing restaurant and install new venthood and grease trap
New Construction of Client Housing (28,106 SF)
Per AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacement
Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing Type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
REVISION TO PR 2026-002750 - TO INCLUDE ELECTRICAL MECHANICAL AND FIRE SUPPRESSION. NO ARCHITECTURAL WORK PERFORMED.
7 DAY REPLACING EXISTING CAR CHARGERS WITH APPROVED AE CHARGERS AT AN EXISTING BUSINESS
+49 more plan review cases in the full issue
+36 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Mar 2–8, 2026.
Start Your Free Trial14 commercial projects in city plan review and 3 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 2 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Update cosmetic existing restaurant and install new venthood and grease trap
A 6773 SF tenant finish out for an office, not sprinkled with no site improvements
Interior remodel existing admin office
Interior Alteration of an Existing Office Space
Interior remodel of existing mercantile space
7 DAY - INTERIOR ALTERATION OF APPROX ( 7678 SF) OF EXISTING INTERIOR SPACE. - OVA
Interior renovation of office suite. Access Control plans included.
Interior remodel to existing business office suite. No access control.
+9 more plan review cases in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Mar 6, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (HVAC / Mechanical) |
|---|---|---|---|---|---|
| Plan Review | Restaurant remodel | Remodel | N/A | Rival 1St LLC | Medium |
| Plan Review | Office space remodel | Remodel | $300K est. (TDLR filing) | N/A | Low |
| Plan Review | Office space remodel | Remodel | $800K est. (TDLR filing) | N/A | Low |
| Plan Review | Office space remodel | Remodel | $450K est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $500K est. (TDLR filing) | Casco | Low |
| Issued Permit | Commercial remodel | Remodel | $600K est. (TDLR filing) | Fore Construction Inc | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.