1. Commercial remodel
Generator Replacement. Existing generator 4x8 pad will be removed, then a new 4x10 pad will be poured to install a new diesel generator. A new ATS will be installed to…
From Monday, Mar 16 through Sunday, Mar 22, 2026, 41 commercial projects entered or moved through City of Austin plan review and 44 commercial building permits were issued. 2 plan review cases and 9 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 20.
41 commercial projects in city plan review and 44 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 30 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Generator Replacement. Existing generator 4x8 pad will be removed, then a new 4x10 pad will be poured to install a new diesel generator. A new ATS will be installed to…
Retaining wall repair
Interior remodel from retail space to office space. New windows in kitchen area. New entry courtyard with ADA ramp. Lighting changes and new mechanical system added
First Time Finish out of Admin Office (38,240 SF)
Construction of a 2998 sf second floor addition within an existing 15063 sf building. Including relocation of AC equipment new bathrooms and offices, as well as a new…
New Construction of Retail Building including Convenience Store and lease Space for Future Tenants (11000 SF).
ePlan: Expedited Review - New Construction of 3-Story Multi-Family Bldg.
COTAland Octopus COTAland Watermania Shade Structure COTAland Kiddie Tower Shade Structure COTAland ATR-22 Tilt-A-Whirl SHST COTAland ATR-32 Carosusel 36 SHS
COTAland Drop Tower & Equipment BLDG. ATR 21 Multi-App (5) COTAland Screaming Swing Canopy & Equipment BLDG. Multi-App (5) COTAland Drop N Twist Shade Structure Multi-App (5) COTAland Kids Helicopter Shade Structure Multi-App (5) COTAland Wacky Worm Costar…
New construction of in ground swimming pool (1059 sf) in courtyard 1 and construction of water feature (72 sf) in courtyard 2. Associated with 2023-039031 PR.
+36 more plan review cases in the full issue
+39 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Mar 16–22, 2026.
Start Your Free Trial9 commercial projects in city plan review and 5 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 2 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Construction of a 2998 sf second floor addition within an existing 15063 sf building. Including relocation of AC equipment new bathrooms and offices, as well as a new…
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios, Dance, Arts 2D and 3D Art. Renovation of Athletics Trainers Room.…
CHANGE OF USE from Auto Parts Shop to Tea House - Approved
Tub to tub replacement (prefab tub) in the same location without relocating plumbing
Change exception from office to food outlet approved. No remodelling work is taking place
Structural design for Pond Wall located at the south-east corner of the property.
2026/03/27 - 2026/03/29 | (2026/03/23 - 2026/04/03) | Experience the pinnacle of motorcycle racing at Circuit of The Americas! Feel the adrenaline across three unforgettable days featuring MotoGPs world-class competition and the debut of the Harley-Davidson…
INTERIOR ALTERATION OF APPROX. ( 10388 SF ) OF EXISTING INTERIOR SPACE.
Interior remodel to business office suite. Minor MEP work with new demising and partition walls and finish work. No access control.
Interior Remodel of Existing Space (798 SF)
+4 more plan review cases in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Mar 20, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | $400K est. (TDLR filing) | Studio Momentum Architects | Low |
| Plan Review | School remodel | Remodel | $230K est. (TDLR filing) | Pfluger Architects | Low |
| Plan Review | Change of use to tea house | Remodel | N/A | Land Answers | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Office space remodel | Remodel | N/A | White Kitchen | Low |
| Issued Permit | New building | New | N/A | Citadel MFC LLC | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.