1. Retail space remodel
Interior remodel from retail space to office space. New windows in kitchen area. New entry courtyard with ADA ramp. Lighting changes and new mechanical system added
From Monday, Mar 16 through Sunday, Mar 22, 2026, 41 commercial projects entered or moved through City of Austin plan review and 44 commercial building permits were issued. 5 plan review cases and 4 issued permits rate Strong or Medium for HVAC / Mechanical work.
This archived issue is ranked for HVAC / Mechanical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 20.
41 commercial projects in city plan review and 44 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 30 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior remodel from retail space to office space. New windows in kitchen area. New entry courtyard with ADA ramp. Lighting changes and new mechanical system added
Fast casual Asian restaurant with mechanical, electrical, plumbing and finishes work to accommodate restaurant functions. This includes the addition of a grease…
First Time Finish out of Admin Office (38,240 SF)
7 DAY - No architectural work in scope. Mech and Elec related work only of an existing demised tenant suite. Suite occupancy classificationand use group remains…
Add HVAC to office/warehouse tenant space
Interior Remodel of Phase II to Existing Food Warehouse Facility. Autostore Automatic High-Pile racking system installation.
Demolition of existing interior walls plumbing fixtures and HVAC Ductwork and change of lease space square footage. No other work being done. No occupancy requested
Tenant Office Build Out for Suite 100 - No Change of Use No Access Control. No Hazmat as this as spec suite.
New Construction of Retail Building including Convenience Store and lease Space for Future Tenants (11000 SF).
Interior remodel to business office suite. Minor MEP work with new demising and partition walls and finish work. No access control.
+36 more plan review cases in the full issue
+39 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Mar 16–22, 2026.
Start Your Free Trial9 commercial projects in city plan review and 5 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 2 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Construction of a 2998 sf second floor addition within an existing 15063 sf building. Including relocation of AC equipment new bathrooms and offices, as well as a new…
Interior remodel of an existing restaurant, use as a coffee bar. Work includes minor demolition, new finishes and lighting, new work area plumbing. Existing restroom to…
Change exception from office to food outlet approved. No remodelling work is taking place
Tenant improvement remodel of an existing rei retail space. work includes: replacement of retail fixtures, finishes, electrical and plumbing fixtures, including but not…
Updates and repairs to the existing office building for the Austin Police Association. Interior renovations to existing office space
Interior remodel to business office suite. Minor MEP work with new demising and partition walls and finish work. No access control.
INTERIOR ALTERATION OF APPROX. ( 10388 SF ) OF EXISTING INTERIOR SPACE.
2026/03/27 - 2026/03/29 | (2026/03/23 - 2026/04/03) | Experience the pinnacle of motorcycle racing at Circuit of The Americas! Feel the adrenaline across three unforgettable days featuring MotoGPs world-class competition and the debut of the Harley-Davidson…
Structural design for Pond Wall located at the south-east corner of the property.
Interior Remodel of Existing Space (798 SF)
+4 more plan review cases in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Mar 20, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (HVAC / Mechanical) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | $400K est. (TDLR filing) | Studio Momentum Architects | Low |
| Plan Review | Restaurant remodel | Remodel | N/A | N/A | Low |
| Plan Review | Office space remodel | Remodel | N/A | White Kitchen | Low |
| Plan Review | Retail space remodel | Remodel | $705K est. (TDLR filing) | Arcadis | Low |
| Plan Review | Office space remodel | Remodel | $200K est. (TDLR filing) | N/A | Low |
| Issued Permit | Office space remodel | Remodel | N/A | Maloba Builders and Services | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.