1. Office space remodel
First Time Finish out of Admin Office (38,240 SF)
No company contact in the City data beyond the permit expediter.
From Monday, Mar 16 through Sunday, Mar 22, 2026, 41 commercial projects entered or moved through City of Austin plan review and 44 commercial building permits were issued. 0 plan review cases and 1 issued permit rate Strong or Medium for Elevator work.
This archived issue is ranked for Elevator work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 20.
41 commercial projects in city plan review and 44 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 30 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
First Time Finish out of Admin Office (38,240 SF)
Construction of a 2998 sf second floor addition within an existing 15063 sf building. Including relocation of AC equipment new bathrooms and offices, as well as a new…
Interior Remodel to Existing Building to Provide Game room, Lounge and Study Area- 1st Floor (8,744 SF)
QT - Interior alteration of approx. 3497 sq ft of existing interior office space - OVA
Change of Use from retail to create an indoor sports and rec space with accessory concessions
INTERIOR REMODEL / FINISH OUT OF SECOND FLOOR AND ELEVATOR PIT.
The Home Depot re-roof like for like with no structural changes. Remove existing membrane install new 1/2 coverboard and install new membrane.
ePlan: Expedited Review - New Construction of 3-Story Multi-Family Bldg.
SIMPLE TPO RE-ROOF - OVA
Interior Remodel of Phase II to Existing Food Warehouse Facility. Autostore Automatic High-Pile racking system installation.
+36 more plan review cases in the full issue
+39 more issued permits in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Mar 16–22, 2026.
Start Your Free Trial9 commercial projects in city plan review and 5 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 2 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Construction of a 2998 sf second floor addition within an existing 15063 sf building. Including relocation of AC equipment new bathrooms and offices, as well as a new…
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios, Dance, Arts 2D and 3D Art. Renovation of Athletics Trainers Room.…
Tenant improvement remodel of an existing rei retail space. work includes: replacement of retail fixtures, finishes, electrical and plumbing fixtures, including but not…
CHANGE OF USE from Auto Parts Shop to Tea House - Approved
Updates and repairs to the existing office building for the Austin Police Association. Interior renovations to existing office space
INTERIOR ALTERATION OF APPROX. ( 10388 SF ) OF EXISTING INTERIOR SPACE.
Interior remodel to business office suite. Minor MEP work with new demising and partition walls and finish work. No access control.
Interior Remodel of Existing Space (798 SF)
2026/03/27 - 2026/03/29 | (2026/03/23 - 2026/04/03) | Experience the pinnacle of motorcycle racing at Circuit of The Americas! Feel the adrenaline across three unforgettable days featuring MotoGPs world-class competition and the debut of the Harley-Davidson…
Structural design for Pond Wall located at the south-east corner of the property.
+4 more plan review cases in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Mar 20, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Elevator) |
|---|---|---|---|---|---|
| Plan Review | Office space remodel | Remodel | $400K est. (TDLR filing) | Studio Momentum Architects | Low |
| Plan Review | School remodel | Remodel | $230K est. (TDLR filing) | Pfluger Architects | Low |
| Plan Review | Retail space remodel | Remodel | $705K est. (TDLR filing) | Arcadis | Low |
| Plan Review | Change of use to tea house | Remodel | N/A | Land Answers | Low |
| Plan Review | Office space remodel | Remodel | $200K est. (TDLR filing) | N/A | Low |
| Issued Permit | Commercial remodel | Remodel | N/A | Jahn Construction LLC | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.