1. Fitness center
New Construction of Athletic Center to Include New Gym and Fieldhouse (20,380 SF). Community Hall moved to separate PR
Architect/Engineer: No Clash LLC (from TDLR filing)
Permit expediter: Austin Permit Service Inc
From Monday, Mar 23 through Sunday, Mar 29, 2026, 34 commercial projects entered or moved through City of Austin plan review and 30 commercial building permits were issued. 0 plan review cases and 0 issued permits rate Strong or Medium for Elevator work.
This archived issue is ranked for Elevator work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 27.
34 commercial projects in city plan review and 30 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 21 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of Athletic Center to Include New Gym and Fieldhouse (20,380 SF). Community Hall moved to separate PR
Interior Remodel to Existing Office/Warehouse (49,987 SF), 51 EV chargers for driverless vehicles, 3 gas generators to power EV chargers. Revision #1 to remove th
Interior Remodel to Existing 1st floor and 11th floor to include Game Room and Lounge (26,000SF)
ePlan Review: New Shell Building, New Parking Garage, Demised Tenant Space 100, Demised Tenant Space 110, Demised Tenant Space 120, Demised Tenant Space 130 6…
Change of Use from Religious Assembly to Admin/Bus Office with minor interior remodel
New Construction of Turn 1 Paddock
Interior Remodel and Change of Use from Warehouse to Manufacturing and Admin Building (450000 SF).
Partial Demolition and Rebuilt of O Henry Middle School. AISD Project.
Finish out of 6th floor areas for medical office.
Interior Alteration of Existing Interior Space (539485 SF).
+29 more plan review cases in the full issue
+25 more issued permits in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Mar 23–29, 2026.
Start Your Free Trial11 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 5 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel to Existing 1st floor and 11th floor to include Game Room and Lounge (26,000SF)
ePlan Review: New Shell Building, New Parking Garage, Demised Tenant Space 100, Demised Tenant Space 110, Demised Tenant Space 120, Demised Tenant Space 130 6…
7 DAY - Interior remodel of existing office space - OVA
Interior remodel of existing retail space #128
Interior alteration of an existing office space including a new demising wall to create separate suites 260 & 265 2 applications
Removal and Replacement of Existing Siding Material on Residential Fourplex 2026 016050 DA - Approved
Interior finish out in an existing commercial space for a restaurant. Building 12
COTAland: Restrooms MF-10
Renovation of an employee work area within a freestanding ER. The total renovation area is 538 sqft. There is no change in use or occupant load.
AT&T Proposes the following scope of work: Tower SOW- Install: new mount (8) CCI Antennas (4) air antennas (12) Radios (2) raycap surge arrestors (2) fiber trucks & (6)DC Trunks. Ground SOW: Remove (e) T-Mobile cabinets & equipt. Utilize (E) concrete pad.…
+6 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Mar 27, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Elevator) |
|---|---|---|---|---|---|
| Plan Review | Restaurant remodel | Remodel | $700K est. (TDLR filing) | Centex Construction | Low |
| Plan Review | 2-story shell building (retail space) with garage | Shell | N/A | Kimley-Horn and Associates | Low |
| Plan Review | Office space remodel | Remodel | $800K est. (TDLR filing) | N/A | Low |
| Plan Review | Retail space remodel | Remodel | $1.5M est. (TDLR filing) | N/A | Low |
| Plan Review | Office space remodel | Remodel | $850K est. (TDLR filing) | Sixthriver | Low |
| Issued Permit | Commercial remodel | Remodel | N/A | 21st Century Painting & Roofing | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.