1. Warehouse remodel
Interior Remodel to Existing Office/Warehouse (49,987 SF), 51 EV chargers for driverless vehicles, 3 gas generators to power EV chargers. Revision #1 to remove th
From Monday, Mar 23 through Sunday, Mar 29, 2026, 34 commercial projects entered or moved through City of Austin plan review and 30 commercial building permits were issued. 0 plan review cases and 1 issued permit rate Strong or Medium for Demolition work.
This archived issue is ranked for Demolition work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 27.
34 commercial projects in city plan review and 30 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 21 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel to Existing Office/Warehouse (49,987 SF), 51 EV chargers for driverless vehicles, 3 gas generators to power EV chargers. Revision #1 to remove th
Interior Remodel to Existing 1st floor and 11th floor to include Game Room and Lounge (26,000SF)
New Construction of Athletic Center to Include New Gym and Fieldhouse (20,380 SF). Community Hall moved to separate PR
TPO single ply recover. Remove existing TPO membrane, install new 1/2 hd cover board rhino bond new80 mil membrane
ePlan Review: New Shell Building, New Parking Garage, Demised Tenant Space 100, Demised Tenant Space 110, Demised Tenant Space 120, Demised Tenant Space 130 6…
Partial Demolition and Rebuilt of O Henry Middle School. AISD Project.
Interior Remodel and Change of Use from Warehouse to Manufacturing and Admin Building (450000 SF).
Completely remove existing historical tile wood shingles and spaced sheathing down to structure for existing sloped concrete tile roof. Clean and salvage historical tile for re-installation. Project proposes using waterseal tile to match existing or Tejas…
Finish out of 6th floor areas for medical office.
Interior Alteration of Existing Interior Space (539485 SF).
+29 more plan review cases in the full issue
+25 more issued permits in the full issue
How fit is scored for demolition work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit demolition wording (demolition, abatement, removal of existing). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Mar 23–29, 2026.
Start Your Free Trial11 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 5 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel to Existing 1st floor and 11th floor to include Game Room and Lounge (26,000SF)
ePlan Review: New Shell Building, New Parking Garage, Demised Tenant Space 100, Demised Tenant Space 110, Demised Tenant Space 120, Demised Tenant Space 130 6…
7 DAY - Interior remodel of existing office space - OVA
Interior remodel of existing retail space #128
Interior alteration of an existing office space including a new demising wall to create separate suites 260 & 265 2 applications
Removal and Replacement of Existing Siding Material on Residential Fourplex 2026 016050 DA - Approved
Interior finish out in an existing commercial space for a restaurant. Building 12
Renovation of an employee work area within a freestanding ER. The total renovation area is 538 sqft. There is no change in use or occupant load.
AT&T Proposes the following scope of work: Tower SOW- Install: new mount (8) CCI Antennas (4) air antennas (12) Radios (2) raycap surge arrestors (2) fiber trucks & (6)DC Trunks. Ground SOW: Remove (e) T-Mobile cabinets & equipt. Utilize (E) concrete pad.…
Create dropped ceiling in living room replace lighting and lighting controls for Suite 1506
+6 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for demolition work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit demolition wording (demolition, abatement, removal of existing). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Mar 27, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Demolition) |
|---|---|---|---|---|---|
| Plan Review | Restaurant remodel | Remodel | $700K est. (TDLR filing) | Centex Construction | Low |
| Plan Review | 2-story shell building (retail space) with garage | Shell | N/A | Kimley-Horn and Associates | Low |
| Plan Review | Office space remodel | Remodel | $800K est. (TDLR filing) | N/A | Low |
| Plan Review | Retail space remodel | Remodel | $1.5M est. (TDLR filing) | N/A | Low |
| Plan Review | Office space remodel | Remodel | $850K est. (TDLR filing) | Sixthriver | Low |
| Issued Permit | Commercial remodel | Remodel | N/A | 21st Century Painting & Roofing | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.