Archive · Week of Mar 9–15, 2026 · Low-Voltage / Security

Austin Low-Voltage / Security Permit Leads: Mar 9–15, 2026

From Monday, Mar 9 through Sunday, Mar 15, 2026, 39 commercial projects entered or moved through City of Austin plan review and 58 commercial building permits were issued. 1 plan review case and 2 issued permits rate Strong or Medium for Low-Voltage / Security work.

This archived issue is ranked for Low-Voltage / Security work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Mar 13.

Austin Permit Leads · Weekly Digest

Week of Mar 9–15, 2026

39 commercial projects in city plan review and 58 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 38 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Week of Mar 9–15

Issued Permits: Week of Mar 9–15

1. Office space remodel

New this week (applied Mar 13)
Remodel · applied Mar 13 · Approved and Released as of Jul 13, 2026 · 12,307 SF · $108K est. (TDLR filing)
Low-Voltage / Security: Medium fit · score 45

Interior Remodel to Existing Office (12,307 SF)

Civil engineer (site plan): LJA Engineering (from 2024 site plan SP-2024-0372D)
Architect/Engineer: KDS de stijl interiors (from TDLR filing)
Permit expediter: Austin Permit Service Inc
View on City of Austin AB+C Portal

2. Retail building with repair garage

New this week (applied Mar 9)
New · applied Mar 9 · Awaiting Update · 4,608 SF · $160K
Low-Voltage / Security: Low fit · score 32

Fuel Canopy for New Construction C Store

Architect/Engineer: Professional StruCIVIL Engineers, Inc (from 2024 site plan SP-2024-0265C)
Permit expediter: JAG Permits
View on City of Austin AB+C Portal

3. Retail space remodel

New this week (applied Mar 9)
Remodel · applied Mar 9 · Approved as of Mar 10, 2026 · $500K est. (TDLR filing)
Low-Voltage / Security: Low fit · score 25

Interior build-out of an existing tenant space for an in-store bank - Suite 100

Owner/Developer: Regency Centers, LP (from 2020 site plan SPC-2020-0252C)
View on City of Austin AB+C Portal

4. Medical clinic remodel

New this week (applied Mar 10)
Remodel · applied Mar 10 · Approved as of Sep 29, 2026 · $100K est. (TDLR filing)
Low-Voltage / Security: Low fit · score 25

Tenant interior renovation of an existing Dialysis clinic. Work includes updating finishes, plumbing, mechanical, electrical, and the addition of a wall to the reception…

No company contact in the City data.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

5. Office space remodel

New this week (applied Mar 11)
Remodel · applied Mar 11 · e-Prerequisite Review Pending · building size 834,200 SF · $4.4M est. (TDLR filing)
Low-Voltage / Security: Low fit · score 25

First Time Finish-Out for Admin Office Floor 15 Suite 1510 (834,200 SF)

Permit expediter: Austin Permit Service
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

1. Office space remodel

Permit issued Mar 13
Remodel · 5,261 SF · $200K est. (TDLR filing) · issued Mar 13
Low-Voltage / Security: Medium fit · score 61

Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spaces.Access control plan provided as separate attachments.…

GC or design-builder: Structura, Inc
View on City of Austin AB+C Portal

2. Office space remodel

Permit issued Mar 10
Remodel · 5,329 SF · $750K est. (TDLR filing) · issued Mar 10
Low-Voltage / Security: Medium fit · score 61

First time interior finish out of office suite for Alamo Drafthouse business headquarters office with Access Control Requested and minor MEP work.

GC or design-builder: Novo Construction
View on City of Austin AB+C Portal

3. Change of use to shell

Permit issued Mar 9
Remodel · 31,675 SF · $4.9M · issued Mar 9
Low-Voltage / Security: Low fit · score 38

Change of Use and Finish Out for Theater and Dance School in Space Previously Retuned to Shell in Phase I scope includes New Exterior Openings for Glazing and Shade Canopies Over Exits. (2025-052228PR) (150000 SF).

No company contact in the City data.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

4. Commercial remodel

Permit issued Mar 9
Remodel · 31,687 SF · $5.8M est. (TDLR filing) · issued Mar 9
Low-Voltage / Security: Low fit · score 38

Interior renovations to existing building addition of new fire suppression system update mechanical and electrical systems PuPR2

GC or design-builder: Southwest Corporation
View on City of Austin AB+C Portal

5. Commercial remodel

Permit issued Mar 13
Remodel · 38,623 SF · $950K est. (TDLR filing) · issued Mar 13
Low-Voltage / Security: Low fit · score 38

Interior Remodel for Core Improvements for Future Finish Out. Not For Occupancy (38623 SF).

GC or design-builder: RCC Associates
View on City of Austin AB+C Portal

+34 more plan review cases in the full issue

+53 more issued permits in the full issue

How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for the week of Mar 9–15, 2026.

Start Your Free Trial
Austin Permit Leads · Daily Recap

Friday, Mar 13, 2026

9 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 9 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Fri, Mar 13

Issued Permits: Fri, Mar 13

1. Office space remodel

New today (applied Mar 13)
Remodel · applied Mar 13 · Approved and Released as of Jul 13, 2026 · 12,307 SF · $108K est. (TDLR filing)
Low-Voltage / Security: Medium fit · score 45

Interior Remodel to Existing Office (12,307 SF)

Civil engineer (site plan): LJA Engineering (from 2024 site plan SP-2024-0372D)
Architect/Engineer: KDS de stijl interiors (from TDLR filing)
Permit expediter: Austin Permit Service Inc
View on City of Austin AB+C Portal

2. Office space remodel

New today (applied Mar 13)
Remodel · applied Mar 13 · Approved as of Mar 25, 2026 · $340K est. (TDLR filing)
Low-Voltage / Security: Low fit · score 25

Interior renovation to create 10th floor corridor and interior renovation for Bus Admin Prof office. (Suite 1020) 2 Apps

GC or design-builder: CL Jones Construction
View on City of Austin AB+C Portal

3. School remodel

New today (applied Mar 13)
Remodel · applied Mar 13 · Approved as of Jun 24, 2026 · $5.9M est. (TDLR filing)
Low-Voltage / Security: Low fit · score 25

Renovations to existing public elementary school including finishes, reroofing, plumbing fixtures, HVAC, envelope sealing, new theatre curtain at stage and replacement…

Owner/Developer: Round Rock ISD
Permit expediter: Mercury Permits
View on City of Austin AB+C Portal

4. Hospital remodel

New today (applied Mar 13)
Remodel · applied Mar 13 · Approved as of Apr 3, 2026
Low-Voltage / Security: Low fit · score 19

Remodel existing 1st floor hospital areas

Owner/Developer: St Davids Healthcare
Permit expediter: Austin Permit Service, Inc
View on City of Austin AB+C Portal

5. Commercial remodel

New today (applied Mar 13)
Remodel · applied Mar 13 · Approved as of Sep 15, 2026
Low-Voltage / Security: Low fit · score 10

7 DAY - Finish out for multi-tenant corridor and restrooms

Permit expediter: Austin Permit Service, Inc
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

1. Office space remodel

Permit issued Mar 13
Remodel · 5,261 SF · $200K est. (TDLR filing) · issued Mar 13
Low-Voltage / Security: Medium fit · score 61

Spec suite on level 6. Existing Break Room with updated finishes only. Renovating existing worksharing layout to become spec suite office space with conference room offices phone rooms and support spaces.Access control plan provided as separate attachments.…

GC or design-builder: Structura, Inc
View on City of Austin AB+C Portal

2. Commercial remodel

Permit issued Mar 13
Remodel · 38,623 SF · $950K est. (TDLR filing) · issued Mar 13
Low-Voltage / Security: Low fit · score 38

Interior Remodel for Core Improvements for Future Finish Out. Not For Occupancy (38623 SF).

GC or design-builder: RCC Associates
View on City of Austin AB+C Portal

4. New building

Permit issued Mar 13
New · issued Mar 13
Low-Voltage / Security: Low fit · score 26

2026/03/13 - 2026/03/14 | 2 day public event with panels sponsor activations and live music #SFS

No company contact in the City data.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

5. New building

Permit issued Mar 13
New · issued Mar 13
Low-Voltage / Security: Low fit · score 18

2026/03/13 - 2026/03/15 | (2026/03/02) | Music concerts with two days of paid admission and one day of free shows. #SXSWAffiliated 2026/03/13 - 2026/03/15 | (2026/03/02) | Music concerts with two days of paid admission and one day of free shows.…

No company contact in the City data.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

+4 more plan review cases in the full issue

+8 more issued permits in the full issue

How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for Friday, Mar 13, 2026.

Start Your Free Trial

Daily Recap Spreadsheet Preview

Daily Recap Feature
Plan Review or Issued PermitAddress / ProjectWorkValuationCompanyFit (Low-Voltage / Security)
Plan ReviewOffice space remodelRemodel$108K est. (TDLR filing)LJA EngineeringMedium
Plan ReviewOffice space remodelRemodel$340K est. (TDLR filing)CL Jones ConstructionLow
Plan ReviewSchool remodelRemodel$5.9M est. (TDLR filing)Round Rock ISDLow
Plan ReviewHospital remodelRemodelN/ASt Davids HealthcareLow
Plan ReviewCommercial remodelRemodelN/AN/ALow
Issued PermitOffice space remodelRemodel$200K est. (TDLR filing)Structura, IncMedium

A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.

← Previous WeekAll WeeksNext Week →

Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.