1. Apartment building with garage
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
From Monday, Apr 20 through Sunday, Apr 26, 2026, 55 commercial projects entered or moved through City of Austin plan review and 62 commercial building permits were issued. 2 plan review cases and 0 issued permits rate Strong or Medium for Low-Voltage / Security work.
This archived issue is ranked for Low-Voltage / Security work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Apr 24.
55 commercial projects in city plan review and 62 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 46 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
BAUS Review New Construction of New Six Gate Satellite Concourse at ABIA (38,224 SF)
New retail shell building
Full floor interior remodel of Floor 2 (22,927 SF), new Addition of Terrace with Lighted Trellis (920 SF) and new rooftop skylights on existing roof (23,847 SF tot
New Construction of a Restaurant
Interior non structural remodel
Interior Finish out of administrative office includes new walls and doors millwork plumbing and electrical reconfigure HVAC for new walls - Unit 304
7 DAY - Interior alteration of an existing office space - OVA
BAUS - Airport Project: Install Necessary Fuel Infrastructure and Equipment to Support a Future Concourse hydrant fuel system and receipt of jet fuel via pipeline.
The Existing 1- Story Retail Structure Is Being Modified to Add 2 Additional Stories of Leasable Office Space above. 3 Stories Total 2024 023039 DA -Approved
+50 more plan review cases in the full issue
+57 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 20–26, 2026.
Start Your Free Trial9 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
New Construction of a Restaurant
Renovation to existing condo unit in MF building, combining two units unto one. SPE approved to reduce the unit count. Master Plumber and Master Electrician have signed…
New tenant repairs (drywall, interior doors, electrical and plumbing fixtures)
Installation of (3) dual-port level 2 EV chargers. City of Austin Fleet Mobility Services Department Electrification Infrastructure Phase 5
INTERIOR REMODEL - OFFICE SPACE
Change of use to restaurant with interior remodel.
Interior remodel of an existing restaurant use as a coffee bar. Work includes minor demolition new finishes and lighting new work area plumbing. Existing restroom to receive new lighting and finishes.
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
water restoration post flood-drywall paint cabinetry flooring in kitchen. No sq ft changes
+4 more plan review cases in the full issue
+2 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Apr 24, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Low-Voltage / Security) |
|---|---|---|---|---|---|
| Plan Review | Apartment building with garage | New | $12.7M | Kimley Horn | Medium |
| Plan Review | Restaurant | New | $1.5M | Foresite Group | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Revive Property Restoration LLC | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $248K est. (TDLR filing) | Dunaway Associates | Low |
| Issued Permit | Office space remodel | Remodel | N/A | KLM Commercial | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.