1. Apartment building with garage
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
From Monday, Apr 20 through Sunday, Apr 26, 2026, 55 commercial projects entered or moved through City of Austin plan review and 62 commercial building permits were issued. 10 plan review cases and 10 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Apr 24.
55 commercial projects in city plan review and 62 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 46 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
New Construction of Multi Family Building, New Parking Garage, and New Shade Structure. New Shell Retail/Restaurant -Below the Podium. (397,939
BAUS Review New Construction of New Six Gate Satellite Concourse at ABIA (38,224 SF)
Full floor interior remodel of Floor 2 (22,927 SF), new Addition of Terrace with Lighted Trellis (920 SF) and new rooftop skylights on existing roof (23,847 SF tot
Installing 4 Single Port EV Charging Stations in the Exterior Parking Lot a Multi-Family Apartment Complex
Generator Replacement. Existing diesel generator/pad will be removed then new 4x10 pad to be poured to install new diesel generator; and install a new ATS to replace existing. All work will be within existing fenced compound.
Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls parking sidewalks or landscape.
Bevolution Project Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls parking sidewalks or landscape.
Remove and replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls parking sidewalks or landscape.
BAUS - Airport Project: Install Necessary Fuel Infrastructure and Equipment to Support a Future Concourse hydrant fuel system and receipt of jet fuel via pipeline.
+50 more plan review cases in the full issue
+57 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 20–26, 2026.
Start Your Free Trial9 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
New Construction of a Restaurant
Qt - foundation repair, bldg 44, installing 38 exterior piles - ova
Qt - foundation repair building 2 installing 16 exterior pilings at existing multifamily - ova
Installation of (3) dual-port level 2 EV chargers. City of Austin Fleet Mobility Services Department Electrification Infrastructure Phase 5
Foundation repair - Installing 95 steel piles to prevent further movement of slab.
INTERIOR REMODEL - OFFICE SPACE
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
water restoration post flood-drywall paint cabinetry flooring in kitchen. No sq ft changes
Emergency repair of the reception area which includes drywall and electrical from damage from a car. **Please note that this type of request is not currently available and this was approved on a one-time basis***
+4 more plan review cases in the full issue
+2 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Apr 24, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Plan Review | Apartment building with garage | New | $12.7M | Kimley Horn | Strong |
| Plan Review | Restaurant | New | $1.5M | Foresite Group | Medium |
| Plan Review | Commercial remodel | Remodel | N/A | Church Foundation Repair | Low |
| Plan Review | Apartment building remodel | Remodel | N/A | Church Foundation Repair | Low |
| Plan Review | Commercial remodel | Remodel | $248K est. (TDLR filing) | Dunaway Associates | Low |
| Issued Permit | Lab remodel | Remodel | N/A | RJT Commercial Inc dba Ram Jack of Texas | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.