1. Apartment building with garage
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
From Monday, Apr 20 through Sunday, Apr 26, 2026, 55 commercial projects entered or moved through City of Austin plan review and 62 commercial building permits were issued. 12 plan review cases and 17 issued permits rate Strong or Medium for Drywall / Framing work.
This archived issue is ranked for Drywall / Framing work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Apr 24.
55 commercial projects in city plan review and 62 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 46 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
BAUS Review New Construction of New Six Gate Satellite Concourse at ABIA (38,224 SF)
CHANGE OF USE from office to dental office¿interior finish-out to add demising walls between existing office suites to create Suite 206, along with an interior remodel
CHANGE OF USE FROM RETAIL/REST TO MEDICAL OFFICE Interior tenant finish-out for acupuncture clinic. Includes non-load-bearing partitions for treatment rooms and…
New tenant repairs (drywall, interior doors, electrical and plumbing fixtures)
Interior Finish out of administrative office includes new walls and doors millwork plumbing and electrical reconfigure HVAC for new walls - Unit 304
Interior non structural remodel
BAUS - Airport Project: Install Necessary Fuel Infrastructure and Equipment to Support a Future Concourse hydrant fuel system and receipt of jet fuel via pipeline.
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
Reconstruct 6 feet of one compromised garage wall to include one entry door. Will install new drywall and tape/float.
+50 more plan review cases in the full issue
+57 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 20–26, 2026.
Start Your Free Trial9 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
New tenant repairs (drywall, interior doors, electrical and plumbing fixtures)
New Construction of a Restaurant
Installation of (3) dual-port level 2 EV chargers. City of Austin Fleet Mobility Services Department Electrification Infrastructure Phase 5
Qt - foundation repair, bldg 44, installing 38 exterior piles - ova
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
water restoration post flood-drywall paint cabinetry flooring in kitchen. No sq ft changes
Emergency repair of the reception area which includes drywall and electrical from damage from a car. **Please note that this type of request is not currently available and this was approved on a one-time basis***
INTERIOR REMODEL - OFFICE SPACE
Change of use to restaurant with interior remodel.
+4 more plan review cases in the full issue
+2 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Apr 24, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Drywall / Framing) |
|---|---|---|---|---|---|
| Plan Review | Apartment building with garage | New | $12.7M | Kimley Horn | Strong |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Medium |
| Plan Review | Restaurant | New | $1.5M | Foresite Group | Medium |
| Plan Review | Commercial remodel | Remodel | $248K est. (TDLR filing) | Dunaway Associates | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Church Foundation Repair | Low |
| Issued Permit | Commercial remodel | Remodel | N/A | LFM Development Inc | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.