1. Change of use to fitness center
CHANGE OF USE MED OFFICE TO PERSONAL USE FITNESS Finish for Fitness Studio in prior demo'd space
From Monday, Apr 20 through Sunday, Apr 26, 2026, 55 commercial projects entered or moved through City of Austin plan review and 62 commercial building permits were issued. 2 plan review cases and 14 issued permits rate Strong or Medium for Demolition work.
This archived issue is ranked for Demolition work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Apr 24.
55 commercial projects in city plan review and 62 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 46 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
CHANGE OF USE MED OFFICE TO PERSONAL USE FITNESS Finish for Fitness Studio in prior demo'd space
7 day - interior remodel floors 1 & 2 to return to shell and add new elevator pit 1st floor and partial 2nd floor demo to allow for future elevator shaft at a currently…
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
Remove existing shingles and replace with new Tamko Titan shingles
Remove existing shingles and replace with new Tamko Titan shingles
Remove existing shingles and replace with new Tamko Titan shingles.
Remove existing shingles and replace with new Tamko Titan shingles.
Remove existing shingles and replace with new Tamko Titan shingles.
Remove existing shingles and replace with new Tamko Titan shingles. Existing multifamily residential.
Remove existing shingles and replace with new Tanko Titan shingles.
+50 more plan review cases in the full issue
+57 more issued permits in the full issue
How fit is scored for demolition work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit demolition wording (demolition, abatement, removal of existing). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 20–26, 2026.
Start Your Free Trial9 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
New tenant repairs (drywall, interior doors, electrical and plumbing fixtures)
New Construction of a Restaurant
Installation of (3) dual-port level 2 EV chargers. City of Austin Fleet Mobility Services Department Electrification Infrastructure Phase 5
Qt - foundation repair, bldg 44, installing 38 exterior piles - ova
Interior remodel of an existing restaurant use as a coffee bar. Work includes minor demolition new finishes and lighting new work area plumbing. Existing restroom to receive new lighting and finishes.
INTERIOR REMODEL - OFFICE SPACE
Change of use to restaurant with interior remodel.
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
Foundation repair - Installing 95 steel piles to prevent further movement of slab.
+4 more plan review cases in the full issue
+2 more issued permits in the full issue
How fit is scored for demolition work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit demolition wording (demolition, abatement, removal of existing). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Apr 24, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Demolition) |
|---|---|---|---|---|---|
| Plan Review | Apartment building with garage | New | $12.7M | Kimley Horn | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Restaurant | New | $1.5M | Foresite Group | Low |
| Plan Review | Commercial remodel | Remodel | $248K est. (TDLR filing) | Dunaway Associates | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Church Foundation Repair | Low |
| Issued Permit | Restaurant remodel | Remodel | N/A | TX Sinclair Builders,LLC | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.