1. Restaurant
New Construction of a Restaurant
From Monday, Apr 20 through Sunday, Apr 26, 2026, 55 commercial projects entered or moved through City of Austin plan review and 62 commercial building permits were issued. 4 plan review cases and 7 issued permits rate Strong or Medium for Kitchen Equipment work.
This archived issue is ranked for Kitchen Equipment work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Apr 24.
55 commercial projects in city plan review and 62 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 46 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of a Restaurant
New Construction of Multi Family Building, New Parking Garage, and New Shade Structure. New Shell Retail/Restaurant -Below the Podium. (397,939
Interior remodel existing admin office building common areas, Suites 100 and 200e. Interior remodel existing admin office accessory food service, Suite 124W
Remodel of store new floors and countertop. Upgrade HVAC. Existing restaurant
New retail shell building
Exterior Remodel of an Existing Pool Bar Area and Addition of New Roof Area Over Two Portions of Level 3 (16000 SF) Level 2 Interior Remodel of Existing Small Kitchen and Wellness Area. (16000 SF)
CHANGE OF USE from Retail/Office to Restaurant and Interior Buildout for Unit 100 (was originally labeled as unit 112 on site plan) 2024 052094 DA - Concurrent Review - EXEMPTION APPROVED UNDER 2025-117228 DA
Includes reorganization of existing kitchen equipment and addition of new fryers units. The existing Type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Change of use to restaurant with interior remodel.
Interior remodel of existing country club to add new bar. No grease trap GIIVR included. No access control.
+50 more plan review cases in the full issue
+57 more issued permits in the full issue
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 20–26, 2026.
Start Your Free Trial9 commercial projects in city plan review and 7 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of a Restaurant
NEW CONSTRUCTION MULTI FAMILY RESIDENCE WITH A GARAGE (buildings 1-9)
Installation of (3) dual-port level 2 EV chargers. City of Austin Fleet Mobility Services Department Electrification Infrastructure Phase 5
Qt - foundation repair, bldg 44, installing 38 exterior piles - ova
Simple Re-Roof
Change of use to restaurant with interior remodel.
Interior remodel of an existing restaurant use as a coffee bar. Work includes minor demolition new finishes and lighting new work area plumbing. Existing restroom to receive new lighting and finishes.
water restoration post flood-drywall paint cabinetry flooring in kitchen. No sq ft changes
INTERIOR REMODEL - OFFICE SPACE
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
+4 more plan review cases in the full issue
+2 more issued permits in the full issue
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Apr 24, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Kitchen Equipment) |
|---|---|---|---|---|---|
| Plan Review | Restaurant | New | $1.5M | Foresite Group | Medium |
| Plan Review | Apartment building with garage | New | $12.7M | Kimley Horn | Low |
| Plan Review | Commercial remodel | Remodel | $248K est. (TDLR filing) | Dunaway Associates | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Church Foundation Repair | Low |
| Plan Review | Commercial remodel | Remodel | N/A | CAS Consulting & Services | Low |
| Issued Permit | Change of use to restaurant | Remodel | N/A | ACC & Design | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.