1. Restaurant remodel
Re-roof with new roof insulation and TPO and replacement of select of top mechanical equipment. Existing piano bar
Permit expediter: Mercury Permits Inc
From Monday, Apr 27 through Sunday, May 3, 2026, 34 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 2 plan review cases and 4 issued permits rate Strong or Medium for Kitchen Equipment work.
This archived issue is ranked for Kitchen Equipment work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, May 1.
34 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 45 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Re-roof with new roof insulation and TPO and replacement of select of top mechanical equipment. Existing piano bar
New construction of a Tim Hortons location approximately 1,400 sq. ft.; a single-story, freestanding quick-service coffee shop/fast-food restaurant. SP-2025-0359 -…
BAUS Review- New Construction of an Additional CMU Enclosure to Existing IT Building (40,125 SF), Scope of Work Will Also Include Installation of Utilities including…
AISD Project: Mendez Middle School in Austin, Texas, is updating Building B with new finishes and minor in structural area layout changes. ATTN ELEC INSP: Disc. or…
Change of use. Business or Trade School (Dental/Medical Asst School) and accessory support office)
142 SF Prep Kitchen renovation
First Generation Restaurant Tenant Improvement within an existing 1-story shell building.
CHANGE OF USE from restaurant to retail store (convenience) DA 2025-158488 concurrent review
Interior commercial kitchen remodel. Scope includes replacement of one 1 existing 4 foot Type I exhaust hood addition of two 2 new 10 foot Type I exhaust hoods associated grease exhaust ductwork and make-up air modification and extension of existing gas pi
Second generation tenant improvement converting an existing pizza shop into a ramen shop. No change in zoning use. The scope of work includes a new interior layout and associated mechanical electrical and plumbing improvements. The existing grease trap shall…
+29 more plan review cases in the full issue
+50 more issued permits in the full issue
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 27–May 3, 2026.
Start Your Free Trial4 commercial projects in city plan review and 3 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 2 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New construction of a Tim Hortons location approximately 1,400 sq. ft.; a single-story, freestanding quick-service coffee shop/fast-food restaurant. SP-2025-0359 -…
Renovation of an existing church for continued use as a church. Scope is limited to new plumbing, ceilings and lighting, and new flooring throughout
Tenant improvement of an existing space
Repair to an existing laundry facility in an existing apartment complex
QT - TPO ROOF REPLACEMENT DOWN TO PLYWOOD - OVA
Add 1692 sf of covered warehouse the existing structure. New cover front of addition (same height) with new staircase to existing exterior door on 2nd floor (located: front right side of existing warehouse).
Construction of in-ground swimming pool
How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, May 1, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Kitchen Equipment) |
|---|---|---|---|---|---|
| Plan Review | 2-story restaurant | New | $1.6M est. (TDLR filing) | CR Engineering | Medium |
| Plan Review | Church remodel | Remodel | $1M est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $300K est. (TDLR filing) | Ward Contracting LLC | Low |
| Plan Review | Apartment complex remodel | Remodel | N/A | N/A | Low |
| Issued Permit | Commercial remodel | Remodel | N/A | DG Roofing, LLC | Low |
| Issued Permit | Addition, warehouse | Addition | $325K | Kb Contractors TX | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.