Archive · Week of Apr 27–May 3, 2026 · Electrical

Austin Electrical Permit Leads: Apr 27–May 3, 2026

From Monday, Apr 27 through Sunday, May 3, 2026, 34 commercial projects entered or moved through City of Austin plan review and 55 commercial building permits were issued. 4 plan review cases and 5 issued permits rate Strong or Medium for Electrical work.

This archived issue is ranked for Electrical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, May 1.

Austin Permit Leads · Weekly Digest

Week of Apr 27–May 3, 2026

34 commercial projects in city plan review and 55 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 45 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Week of Apr 27–May 3

Issued Permits: Week of Apr 27–May 3

1. Office space remodel

New this week (applied Apr 27)
Remodel · applied Apr 27 · Approved as of Jun 5, 2026 · $420K est. (TDLR filing)
Electrical: Medium fit · score 52

Minor interior tenant improvement modification to existing office space on levels 1 and 3. Replacement of existing security turnstiles with some minor electrical…

Owner/Developer: Shoal Creek Walk Ltd
Permit expediter: Lccp, LLC
View on City of Austin AB+C Portal

2. School remodel

New this week (applied Apr 29)
Remodel · applied Apr 29 · Approved as of Sep 17, 2026 · $3.5M est. (TDLR filing)
Electrical: Medium fit · score 48

AISD Project: Mendez Middle School in Austin, Texas, is updating Building B with new finishes and minor in structural area layout changes. ATTN ELEC INSP: Disc. or…

Owner/Developer: Austin Independent School District
Permit expediter: Permit Us Now
View on City of Austin AB+C Portal

3. Church remodel

New this week (applied May 1)
Remodel · applied May 1 · Approved as of Jun 23, 2026 · $1M est. (TDLR filing)
Electrical: Medium fit · score 43

Renovation of an existing church for continued use as a church. Scope is limited to new plumbing, ceilings and lighting, and new flooring throughout

No company contact in the City data.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

4. Addition and remodel

New this week (applied Apr 28)
Addition and Remodel · applied Apr 28 · In e-Review · 40,125 SF · $1.0M
Electrical: Medium fit · score 40

BAUS Review- New Construction of an Additional CMU Enclosure to Existing IT Building (40,125 SF), Scope of Work Will Also Include Installation of Utilities including…

Architect/Engineer: HDR Engineering, Inc
View on City of Austin AB+C Portal

5. 2-story restaurant

New this week (applied May 1)
New · applied May 1 · Approved as of Oct 12, 2026 · 1,400 SF · $1.6M est. (TDLR filing)
Electrical: Low fit · score 28

New construction of a Tim Hortons location approximately 1,400 sq. ft.; a single-story, freestanding quick-service coffee shop/fast-food restaurant. SP-2025-0359 -…

Architect/Engineer: CR Engineering (from 2025 site plan SP-2025-0359C)
View on City of Austin AB+C Portal

1. Retail space remodel

Permit issued Apr 29
Remodel · 6,054 SF · $480K est. (TDLR filing) · issued Apr 29
Electrical: Medium fit · score 55

Remodel the existing Bldg J into a Jewelry Store. The work is mostly a cosmetic renovation the demolition is mainly the removal of existing lighting and flooring - no changes to walls or spaces within the store.

GC or design-builder: River Ranch Roofing LLC
View on City of Austin AB+C Portal

3. School remodel

Permit issued Apr 30
Remodel · 5,000 SF · $240K est. (TDLR filing) · issued Apr 30
Electrical: Medium fit · score 49

AISD Zavala Elementary School in Austin Texas installation of new doors and window shades in certain classrooms as well as upgrades to certain electrical systems. These are not intended to create building separations nor are they expected to impede building…

GC or design-builder: Novium Group LLC
View on City of Austin AB+C Portal

4. Retail space remodel

Permit issued Apr 29
Remodel · 650 SF · issued Apr 29
Electrical: Medium fit · score 48

Second generation tenant improvement converting an existing pizza shop into a ramen shop. No change in zoning use. The scope of work includes a new interior layout and associated mechanical electrical and plumbing improvements. The existing grease trap shall…

GC or design-builder: HHC Consultant
View on City of Austin AB+C Portal

5. Office space remodel

Permit issued Apr 29
Remodel · 12,419 SF · issued Apr 29
Electrical: Medium fit · score 42

INTERIOR REMODEL OF EXISTING OFFICE SPACE-CONSTRUCTION OF NEW WALLS FOR CONF. RMS AND PRIVATE OFFICES.

GC or design-builder: DKC Construction Group
View on City of Austin AB+C Portal

+29 more plan review cases in the full issue

+50 more issued permits in the full issue

How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for the week of Apr 27–May 3, 2026.

Start Your Free Trial
Austin Permit Leads · Daily Recap

Friday, May 1, 2026

4 commercial projects in city plan review and 3 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 2 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Fri, May 1

Issued Permits: Fri, May 1

1. Church remodel

New today (applied May 1)
Remodel · applied May 1 · Approved as of Jun 23, 2026 · $1M est. (TDLR filing)
Electrical: Medium fit · score 43

Renovation of an existing church for continued use as a church. Scope is limited to new plumbing, ceilings and lighting, and new flooring throughout

No company contact in the City data.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

2. 2-story restaurant

New today (applied May 1)
New · applied May 1 · Approved as of Oct 12, 2026 · 1,400 SF · $1.6M est. (TDLR filing)
Electrical: Low fit · score 28

New construction of a Tim Hortons location approximately 1,400 sq. ft.; a single-story, freestanding quick-service coffee shop/fast-food restaurant. SP-2025-0359 -…

Architect/Engineer: CR Engineering (from 2025 site plan SP-2025-0359C)
View on City of Austin AB+C Portal

3. Apartment complex remodel

New today (applied May 1)
Remodel · applied May 1 · Approved as of Jul 13, 2026
Electrical: Low fit · score 13

Repair to an existing laundry facility in an existing apartment complex

Permit expediter: KS Permitting LLC
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

2. Addition, warehouse

Permit issued May 1
Addition · 1,692 SF · $325K · issued May 1
Electrical: Low fit · score 0

Add 1692 sf of covered warehouse the existing structure. New cover front of addition (same height) with new staircase to existing exterior door on 2nd floor (located: front right side of existing warehouse).

GC or design-builder: Kb Contractors TX
View on City of Austin AB+C Portal

3. Commercial remodel

Permit issued May 1
Remodel · 3,900 SF · issued May 1
Electrical: Low fit · score 0

QT - TPO ROOF REPLACEMENT DOWN TO PLYWOOD - OVA

GC or design-builder: DG Roofing, LLC
View on City of Austin AB+C Portal

How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for Friday, May 1, 2026.

Start Your Free Trial

Daily Recap Spreadsheet Preview

Daily Recap Feature
Plan Review or Issued PermitAddress / ProjectWorkValuationCompanyFit (Electrical)
Plan ReviewChurch remodelRemodel$1M est. (TDLR filing)N/AMedium
Plan Review2-story restaurantNew$1.6M est. (TDLR filing)CR EngineeringLow
Plan ReviewApartment complex remodelRemodelN/AN/ALow
Plan ReviewCommercial remodelRemodel$300K est. (TDLR filing)Ward Contracting LLCLow
Issued PermitNew buildingNew$50KPools Unlimited, IncLow
Issued PermitAddition, warehouseAddition$325KKb Contractors TXLow

A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.

← Previous WeekAll WeeksNext Week →

Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.