1. Apartment building
SMART HOUSING - New Multifamily Construction. Ground up Construction to full occupancy including 3 transformers, 3 Fire Areas, a Courtyard, and a detention pond.) Access…
From Monday, Apr 13 through Sunday, Apr 19, 2026, 42 commercial projects entered or moved through City of Austin plan review and 87 commercial building permits were issued. 6 plan review cases and 26 issued permits rate Strong or Medium for Drywall / Framing work.
This archived issue is ranked for Drywall / Framing work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Apr 17.
42 commercial projects in city plan review and 87 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 69 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
SMART HOUSING - New Multifamily Construction. Ground up Construction to full occupancy including 3 transformers, 3 Fire Areas, a Courtyard, and a detention pond.) Access…
New Construction of Elementary School (87,818 SF)
New commercial building for padel tenant
Interior Remodel to Existing Retail Store (30,970 SF)
Interior Remodel to Existing Theater (26,075 SF)
T100 Demolition and finish out of a newly demised white boxed tenant suite. Suite occupancy classification and use group remains unchanged by the scope of work. No access control. T200 Suite T200 side of new demising wall to complete the suite T100 white…
Interior remodel of an existing coffee shop to become a cocktail bar on the first floor of an existing two-story building. Demolition of walls doors restrooms & MEP systems addition of sprinkler system new walls doors restrooms MEP systems finishes &…
Construction of a New 3-Story Building to include Science Labs and CTE Spaces Additional Parking and Landscape PuPR2
Interior finish out of partial floor in an existing shell building for new tenant. The work includes limited demolition new non-structural partitions ceilings finishes millwork and furniture equipment and associated MEP improvements.
Selective demolition of existing tenant interior and exterior. Sub divide existing space into (3) retail shells. Not for occupancy Unit 101- 20572 sf Unit 101A 13800 sf
+37 more plan review cases in the full issue
+82 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 13–19, 2026.
Start Your Free Trial9 commercial projects in city plan review and 17 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 10 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of Elementary School (87,818 SF)
Renovation of 10 existing senior multifamily apartment buildings consisting of interior unit renovations, accessibility upgrades, minor structural repairs,…
Install interior and exterior doors as shown on plans. Rework existing exterior pavement in accommodation of new exterior doors as shown on plans. Update door hardware…
Stucco repairs to exterior of building. Replace rotted wood as needed
Non-structural remodel for existing warehouse
Selective demolition of existing tenant interior and exterior. Sub divide existing space into (3) retail shells. Not for occupancy Unit 101- 20572 sf Unit 101A 13800 sf
First time finish out of an existing tenant space in shell building. No change of use. No access control.
Interior finishes and fixtures replace storefront doors
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 1 - involves demolition of existing Perfect…
First time finish out of an existing tenant corridor in shell building. No change of use. No access control. First time finish out of an existing tenant space in shell building. (Suite 400)
+4 more plan review cases in the full issue
+12 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Apr 17, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Drywall / Framing) |
|---|---|---|---|---|---|
| Plan Review | 2-story school | New | $25.0M | Garza EMC LLC | Strong |
| Plan Review | Apartment building remodel | Remodel | $3.8M est. (TDLR filing) | Alliance Architecture | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Kimley Horn | Low |
| Plan Review | Commercial remodel | Remodel | N/A | 4533 South Austin Hotel Property Owner LLC | Low |
| Plan Review | Warehouse remodel | Remodel | $216K est. (TDLR filing) | 5111 Burnet Road LP | Low |
| Issued Permit | Retail space remodel | Remodel | $500K est. (TDLR filing) | Mooring USA | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.