1. Apartment building
SMART HOUSING - New Multifamily Construction. Ground up Construction to full occupancy including 3 transformers, 3 Fire Areas, a Courtyard, and a detention pond.) Access…
From Monday, Apr 13 through Sunday, Apr 19, 2026, 42 commercial projects entered or moved through City of Austin plan review and 87 commercial building permits were issued. 6 plan review cases and 4 issued permits rate Strong or Medium for Low-Voltage / Security work.
This archived issue is ranked for Low-Voltage / Security work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Apr 17.
42 commercial projects in city plan review and 87 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 69 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
SMART HOUSING - New Multifamily Construction. Ground up Construction to full occupancy including 3 transformers, 3 Fire Areas, a Courtyard, and a detention pond.) Access…
New Construction of Elementary School (87,818 SF)
7 day - interiore remodel to existing office suite with mep scope. no access control. jbox rough in only, future tenant will apply for access control. - ova
New commercial building for padel tenant
Interior Remodel to Existing Retail Store (30,970 SF)
ATR-25 Telecombat - New Amusement Park Ride.
Selective demolition of existing tenant interior and exterior. Sub divide existing space into (3) retail shells. Not for occupancy Unit 101- 20572 sf Unit 101A 13800 sf
Interior Remodel to Existing Office (151395 SF)
Construction of a New 3-Story Building to include Science Labs and CTE Spaces Additional Parking and Landscape PuPR2
Interior finishes and fixtures replace storefront doors
+37 more plan review cases in the full issue
+82 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 13–19, 2026.
Start Your Free Trial9 commercial projects in city plan review and 17 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 10 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of Elementary School (87,818 SF)
Renovation of 10 existing senior multifamily apartment buildings consisting of interior unit renovations, accessibility upgrades, minor structural repairs,…
Condominium renovation includes kitchen, bathrooms, and bedrooms for Unit 2007
Structural repairs. Buildings 3, 4, and 7. Multifamily residential
Install interior and exterior doors as shown on plans. Rework existing exterior pavement in accommodation of new exterior doors as shown on plans. Update door hardware…
Selective demolition of existing tenant interior and exterior. Sub divide existing space into (3) retail shells. Not for occupancy Unit 101- 20572 sf Unit 101A 13800 sf
Interior finishes and fixtures replace storefront doors
First time finish out of an existing tenant space in shell building. No change of use. No access control.
Interior remodel existing admin office
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 1 - involves demolition of existing Perfect…
+4 more plan review cases in the full issue
+12 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Apr 17, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Low-Voltage / Security) |
|---|---|---|---|---|---|
| Plan Review | 2-story school | New | $25.0M | Garza EMC LLC | Strong |
| Plan Review | Apartment building remodel | Remodel | $3.8M est. (TDLR filing) | Alliance Architecture | Low |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Apartment building remodel | Remodel | N/A | Beavers Design | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Kimley Horn | Low |
| Issued Permit | Retail space remodel | Remodel | $500K est. (TDLR filing) | Mooring USA | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.