1. Apartment building
SMART HOUSING - New Multifamily Construction. Ground up Construction to full occupancy including 3 transformers, 3 Fire Areas, a Courtyard, and a detention pond.) Access…
From Monday, Apr 13 through Sunday, Apr 19, 2026, 42 commercial projects entered or moved through City of Austin plan review and 87 commercial building permits were issued. 7 plan review cases and 9 issued permits rate Strong or Medium for HVAC / Mechanical work.
This archived issue is ranked for HVAC / Mechanical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Apr 17.
42 commercial projects in city plan review and 87 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 69 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
SMART HOUSING - New Multifamily Construction. Ground up Construction to full occupancy including 3 transformers, 3 Fire Areas, a Courtyard, and a detention pond.) Access…
New Construction of Elementary School (87,818 SF)
Interior Remodel to Existing Theater (26,075 SF)
New commercial building for padel tenant
Interior Remodel to Existing Business Lab, Phase 3. New electrical, mechanical and clean dry air work only. (1,500 SF)
Replacement of new accessible platform and toilet rooms. New exterior and interior finishes and furnishes. Replacement of electrical and mechanical systems. Replacement of attic insulation. Sidewalk will get worked on.
Selective demolition of existing tenant interior and exterior. Sub divide existing space into (3) retail shells. Not for occupancy Unit 101- 20572 sf Unit 101A 13800 sf
Interior remodel of an existing coffee shop to become a cocktail bar on the first floor of an existing two-story building. Demolition of walls doors restrooms & MEP systems addition of sprinkler system new walls doors restrooms MEP systems finishes &…
Interior remodel to existing suite with change of use from personal services to tutoring center both B uses. MEP Scope and structural verification for RTU. No access Control.
7 DAY - INTERIOR DEMOLITION OF FIRST FLOOR INCLUDING STRUCTURAL MODIFICATIONS. ELECTRICAL ROOM AND HVAC CLOSET WILL REMAIN - THESE ITEMS ARE NOT IN SCOPE AND SHALL REMAIN AS EXISTING. NO EXTERIOR WORK SHALL BE INCLUDED IN SCOPE. SECOND FLOOR OF BUILDING IS…
+37 more plan review cases in the full issue
+82 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Apr 13–19, 2026.
Start Your Free Trial9 commercial projects in city plan review and 17 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 10 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of Elementary School (87,818 SF)
Condominium renovation includes kitchen, bathrooms, and bedrooms for Unit 2007
Renovation of 10 existing senior multifamily apartment buildings consisting of interior unit renovations, accessibility upgrades, minor structural repairs,…
Structural repairs. Buildings 3, 4, and 7. Multifamily residential
Stucco repairs to exterior of building. Replace rotted wood as needed
Selective demolition of existing tenant interior and exterior. Sub divide existing space into (3) retail shells. Not for occupancy Unit 101- 20572 sf Unit 101A 13800 sf
Add AC units to existing ESFR Sprinklered Warehouse
Interior finishes and fixtures replace storefront doors
First time finish out of an existing tenant space in shell building. No change of use. No access control.
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 1 - involves demolition of existing Perfect…
+4 more plan review cases in the full issue
+12 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Apr 17, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (HVAC / Mechanical) |
|---|---|---|---|---|---|
| Plan Review | 2-story school | New | $25.0M | Garza EMC LLC | Strong |
| Plan Review | Commercial remodel | Remodel | N/A | N/A | Low |
| Plan Review | Apartment building remodel | Remodel | $3.8M est. (TDLR filing) | Alliance Architecture | Low |
| Plan Review | Apartment building remodel | Remodel | N/A | Beavers Design | Low |
| Plan Review | Commercial remodel | Remodel | N/A | 4533 South Austin Hotel Property Owner LLC | Low |
| Issued Permit | Retail space remodel | Remodel | $500K est. (TDLR filing) | Mooring USA | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.