1. Apartment building remodel
Interior build-back and restoration of two fire-damaged apartment units. Replacement of drywall, insulation, finishes, cabinetry, flooring, doors, windows, electrical,…
From Monday, Aug 17 through Sunday, Aug 23, 2026, 36 commercial projects entered or moved through City of Austin plan review and 56 commercial building permits were issued. 4 plan review cases and 18 issued permits rate Strong or Medium for Drywall / Framing work.
This archived issue is ranked for Drywall / Framing work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Aug 21.
36 commercial projects in city plan review and 56 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 39 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior build-back and restoration of two fire-damaged apartment units. Replacement of drywall, insulation, finishes, cabinetry, flooring, doors, windows, electrical,…
Interior remodel Area C Interior remodel expanding unit 325 into 350 and 360 AREA C. This not a revision, it is its own permit. Demo, new partitions. Ceiling finishes.…
Commercial/Residential Review: 3 Story Fourplex Residential over open parking. Each unit has private entrance and each fourplex is separated by a 2-hour fire wall
New Construction for Cantina for COTAland. TBP created for BP and PP 2026-129590 JWE 10/01/2026
Addition and Remodel to Existing Exterior Hospital Services. Work to include replacing existing Generator and Fuel Tank. Electrical scope is split int
INTERIOR REMODEL new finishes ceilings and lighting and the building out of new office space
New Construction of an Elementary School on Existing Site. Building to include 1 story and 3 story Portions. (94951 SF)
Construction of a new 51250 sq. ft single story middle school. [phone removed]
CHANGE OF USE OFFICE TO RETAIL with Demo to interior walls demo electrical in interior walls install cameras in existing locations re-route outlets and switches all plumbing and mechanical to remain polished concrete floors paint
Interior remodel of existing office suite 470 with new demising wall to reduce sq ft of previous suite 470 and create a new suite 475. existing card readers to remain as is. (Unit 470) Interior remodel of existing office suite with new demising wall to reduce…
+31 more plan review cases in the full issue
+51 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 17–23, 2026.
Start Your Free Trial7 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 6 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Commercial/Residential Review: 3 Story Fourplex Residential over open parking. Each unit has private entrance and each fourplex is separated by a 2-hour fire wall
Interior remodel to existing Admn/Bus Office
Finish out for admin office
Interior remodel
CHANGE OF USE FINANCE TO RETAIL Total Wireless retail store
Interior remodel of existing space. Demo and install new partition walls new finishes and lighting fixtures. Existing business offices.
ePlan: BAUS Review - Interior Office Block Fit Out of the KAUS Air Cargo Building (6711 SF).
New Solar Canopy.
Park playground improvements.
Fast casual Asian restaurant with mechanical electrical plumbing and finishes work to accommodate restaurant functions. This includes the addition of a grease interceptor and replacement of rooftop equipment but no other exterior work
+2 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Aug 21, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Drywall / Framing) |
|---|---|---|---|---|---|
| Plan Review | New 3-story building | New | $1.5M | CJ BP 2713 Hemphill LLC | Medium |
| Plan Review | Office space remodel | Remodel | $135K est. (TDLR filing) | JDAI Studio | Low |
| Plan Review | Office space remodel | Remodel | $108K est. (TDLR filing) | Moore JH 502 LLC | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Post Apartment Homes LP | Low |
| Plan Review | Change of use to retail space | Remodel | $60K est. (TDLR filing) | NPM Business LLC | Low |
| Issued Permit | Office space remodel | Remodel | $1.4M est. (TDLR filing) | Balfour Beatty Construction, LLC | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.