1. New 3-story building
Commercial/Residential Review: 3 Story Fourplex Residential over open parking. Each unit has private entrance and each fourplex is separated by a 2-hour fire wall
From Monday, Aug 17 through Sunday, Aug 23, 2026, 36 commercial projects entered or moved through City of Austin plan review and 56 commercial building permits were issued. 4 plan review cases and 10 issued permits rate Strong or Medium for Glazing / Storefront work.
This archived issue is ranked for Glazing / Storefront work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Aug 21.
36 commercial projects in city plan review and 56 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 39 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Commercial/Residential Review: 3 Story Fourplex Residential over open parking. Each unit has private entrance and each fourplex is separated by a 2-hour fire wall
Addition and Remodel to Existing Exterior Hospital Services. Work to include replacing existing Generator and Fuel Tank. Electrical scope is split int
New freestanding Take 5 Oil Change 3 bay prototype. ATTN ELEC INSP: Signs or any section of the signs that can be energized shall have a disconnecting means located…
New Construction for Cantina for COTAland. TBP created for BP and PP 2026-129590 JWE 10/01/2026
Repair, replace window - window frame. (Building 1 - Unit 1143, 1343 and 1443)
New Construction of an Elementary School on Existing Site. Building to include 1 story and 3 story Portions. (94951 SF)
Construction of a new 51250 sq. ft single story middle school. [phone removed]
New commercial building for padel tenant
New construction of a 2700 sqft Type V-B single story restaurant with drive-thru.
Smart Housing Project - remodel and addition to existing historic bldg to convert to 6 resd units comprised of 282 sqft of remodel space and 3397 sqft of new construction - 3679 sqft. (Building 2)
+31 more plan review cases in the full issue
+51 more issued permits in the full issue
How fit is scored for glazing and storefront work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit glazing wording (storefront, curtain wall, glazing, windows, facade). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 17–23, 2026.
Start Your Free Trial7 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 6 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Commercial/Residential Review: 3 Story Fourplex Residential over open parking. Each unit has private entrance and each fourplex is separated by a 2-hour fire wall
CHANGE OF USE FINANCE TO RETAIL Total Wireless retail store
Remodel of one corner of the space to add three new dental chairs. (Floor 1)
Remodel of a former Arby's to a Tim Hortons coffee shop
Interior remodel to existing Admn/Bus Office
New Solar Canopy.
Park playground improvements.
Provide security enclosure for existing manufacturing zone and upgrade infrastructure to support new equipment needs.
ePlan: BAUS Review - Interior Office Block Fit Out of the KAUS Air Cargo Building (6711 SF).
Fast casual Asian restaurant with mechanical electrical plumbing and finishes work to accommodate restaurant functions. This includes the addition of a grease interceptor and replacement of rooftop equipment but no other exterior work
+2 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for glazing and storefront work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit glazing wording (storefront, curtain wall, glazing, windows, facade). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Aug 21, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Glazing / Storefront) |
|---|---|---|---|---|---|
| Plan Review | New 3-story building | New | $1.5M | CJ BP 2713 Hemphill LLC | Medium |
| Plan Review | Change of use to retail space | Remodel | $60K est. (TDLR filing) | NPM Business LLC | Low |
| Plan Review | Medical clinic remodel | Remodel | N/A | Metalwood Construction LLC | Low |
| Plan Review | Retail space remodel | Remodel | N/A | WP Developments LLC | Low |
| Plan Review | Office space remodel | Remodel | $135K est. (TDLR filing) | JDAI Studio | Low |
| Issued Permit | New building | New | $300K est. (TDLR filing) | DPR Construction | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.