1. Commercial remodel
Demo of finishes, some millwork, walls and doors, light fixtures, and remodel to include new finishes, walls, doors, and millwork. Demo and new work also includes…
From Monday, Aug 17 through Sunday, Aug 23, 2026, 36 commercial projects entered or moved through City of Austin plan review and 56 commercial building permits were issued. 4 plan review cases and 15 issued permits rate Strong or Medium for Doors & Hardware work.
This archived issue is ranked for Doors & Hardware work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Aug 21.
36 commercial projects in city plan review and 56 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 39 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Demo of finishes, some millwork, walls and doors, light fixtures, and remodel to include new finishes, walls, doors, and millwork. Demo and new work also includes…
Interior build-back and restoration of two fire-damaged apartment units. Replacement of drywall, insulation, finishes, cabinetry, flooring, doors, windows, electrical,…
Commercial/Residential Review: 3 Story Fourplex Residential over open parking. Each unit has private entrance and each fourplex is separated by a 2-hour fire wall
New Construction for Cantina for COTAland. TBP created for BP and PP 2026-129590 JWE 10/01/2026
Addition and Remodel to Existing Exterior Hospital Services. Work to include replacing existing Generator and Fuel Tank. Electrical scope is split int
New Construction of an Elementary School on Existing Site. Building to include 1 story and 3 story Portions. (94951 SF)
Construction of a new 51250 sq. ft single story middle school. [phone removed]
Renovation of an existing leasing office to include restroom remodels light fixtures and HVAC systems new attic insulation and finishes and Renovation of an existing multi-family apartment complex to include kitchen and bath remodels light fixtures and HVAC…
Interior remodel to wall off the doors that used to connect suite 104 with 100 and return suite 104 to individual suite NO MEP. No fire protection modifications. No access control.
Tenant Finish Out - A COWORKING SPACE - PRIVATE OFFICES WORK CAF AND KITCHENETTE WELLNESS ROOM CONFERENCE ROOMS AND OPEN WORK AREAS . MECHANICAL - NEW HVAC. ELECTRICAL -NEW LIGHTING POWER AND DATA THROUGHOUT. PLUMBING - WATER/WASTE LINES
+31 more plan review cases in the full issue
+51 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 17–23, 2026.
Start Your Free Trial7 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 6 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Commercial/Residential Review: 3 Story Fourplex Residential over open parking. Each unit has private entrance and each fourplex is separated by a 2-hour fire wall
Interior remodel to existing Admn/Bus Office
Finish out for admin office
Interior remodel
CHANGE OF USE FINANCE TO RETAIL Total Wireless retail store
ePlan: BAUS Review - Interior Office Block Fit Out of the KAUS Air Cargo Building (6711 SF).
New Solar Canopy.
Park playground improvements.
Fast casual Asian restaurant with mechanical electrical plumbing and finishes work to accommodate restaurant functions. This includes the addition of a grease interceptor and replacement of rooftop equipment but no other exterior work
NEW TENANT FINISH OUT TAQUERIA DE DIEZ MOVING INTO A FORMER RESTAURANT TENANT SPACE.
+2 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Aug 21, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Doors & Hardware) |
|---|---|---|---|---|---|
| Plan Review | New 3-story building | New | $1.5M | CJ BP 2713 Hemphill LLC | Medium |
| Plan Review | Office space remodel | Remodel | $135K est. (TDLR filing) | JDAI Studio | Low |
| Plan Review | Office space remodel | Remodel | $108K est. (TDLR filing) | Moore JH 502 LLC | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Post Apartment Homes LP | Low |
| Plan Review | Change of use to retail space | Remodel | $60K est. (TDLR filing) | NPM Business LLC | Low |
| Issued Permit | Office space remodel | Remodel | $1.5M est. (TDLR filing) | Powerhouse Retail Services | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.