1. Retail building
New Construction for Cantina for COTAland. TBP created for BP and PP 2026-129590 JWE 10/01/2026
Permit expediter: Aus-Tex Building Consultants
From Monday, Aug 17 through Sunday, Aug 23, 2026, 36 commercial projects entered or moved through City of Austin plan review and 56 commercial building permits were issued. 0 plan review cases and 8 issued permits rate Strong or Medium for Low-Voltage / Security work.
This archived issue is ranked for Low-Voltage / Security work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Aug 21.
36 commercial projects in city plan review and 56 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 39 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction for Cantina for COTAland. TBP created for BP and PP 2026-129590 JWE 10/01/2026
Commercial/Residential Review: 3 Story Fourplex Residential over open parking. Each unit has private entrance and each fourplex is separated by a 2-hour fire wall
Interior remodel to existing Admn/Bus Office
Interior remodel to combine suites 120 and 170 to create new common area amenity space for the building. No change of use. Common area is accessory to the admin office…
Interior remodel to existing Admn/Bus Office
New Construction of an Elementary School on Existing Site. Building to include 1 story and 3 story Portions. (94951 SF)
Construction of a new 51250 sq. ft single story middle school. [phone removed]
CHANGE OF USE OFFICE TO RETAIL with Demo to interior walls demo electrical in interior walls install cameras in existing locations re-route outlets and switches all plumbing and mechanical to remain polished concrete floors paint
Renovation of an existing leasing office to include restroom remodels light fixtures and HVAC systems new attic insulation and finishes and Renovation of an existing multi-family apartment complex to include kitchen and bath remodels light fixtures and HVAC…
Tenant Finish Out - A COWORKING SPACE - PRIVATE OFFICES WORK CAF AND KITCHENETTE WELLNESS ROOM CONFERENCE ROOMS AND OPEN WORK AREAS . MECHANICAL - NEW HVAC. ELECTRICAL -NEW LIGHTING POWER AND DATA THROUGHOUT. PLUMBING - WATER/WASTE LINES
+31 more plan review cases in the full issue
+51 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 17–23, 2026.
Start Your Free Trial7 commercial projects in city plan review and 9 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 6 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Commercial/Residential Review: 3 Story Fourplex Residential over open parking. Each unit has private entrance and each fourplex is separated by a 2-hour fire wall
Interior remodel to existing Admn/Bus Office
Finish out for admin office
Remodel of one corner of the space to add three new dental chairs. (Floor 1)
CHANGE OF USE FINANCE TO RETAIL Total Wireless retail store
ePlan: BAUS Review - Interior Office Block Fit Out of the KAUS Air Cargo Building (6711 SF).
7 DAY - Interior remodel of existing office. no access control - OVA
Interior remodel of existing space. Demo and install new partition walls new finishes and lighting fixtures. Existing business offices.
SMALL PROJECT - Interior remodel to an orthodontics clinic to include new finishes millwork modifications new light fixtures and new plumbing fixtures in exam bays.
Fast casual Asian restaurant with mechanical electrical plumbing and finishes work to accommodate restaurant functions. This includes the addition of a grease interceptor and replacement of rooftop equipment but no other exterior work
+2 more plan review cases in the full issue
+4 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Aug 21, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Low-Voltage / Security) |
|---|---|---|---|---|---|
| Plan Review | New 3-story building | New | $1.5M | CJ BP 2713 Hemphill LLC | Low |
| Plan Review | Office space remodel | Remodel | $135K est. (TDLR filing) | JDAI Studio | Low |
| Plan Review | Office space remodel | Remodel | $108K est. (TDLR filing) | Moore JH 502 LLC | Low |
| Plan Review | Medical clinic remodel | Remodel | N/A | Metalwood Construction LLC | Low |
| Plan Review | Change of use to retail space | Remodel | $60K est. (TDLR filing) | NPM Business LLC | Low |
| Issued Permit | Office space remodel | Remodel | $1.5M est. (TDLR filing) | Powerhouse Retail Services | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.