1. Restaurant remodel
BAUS Review - Interior Remodel to Existing Airport Lounge, Scope of Work to Include New Partitions, Doors, Finishes, Ceilings, Lighting, MEP, Sprinkler, and Fire Alarm…
From Monday, Aug 24 through Sunday, Aug 30, 2026, 65 commercial projects entered or moved through City of Austin plan review and 44 commercial building permits were issued. 7 plan review cases and 12 issued permits rate Strong or Medium for Drywall / Framing work.
This archived issue is ranked for Drywall / Framing work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Aug 28.
65 commercial projects in city plan review and 44 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 35 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
BAUS Review - Interior Remodel to Existing Airport Lounge, Scope of Work to Include New Partitions, Doors, Finishes, Ceilings, Lighting, MEP, Sprinkler, and Fire Alarm…
New construction of one metal warehouse building with two tenant suites.
Remove demising wall to expand suite into adjacent areas. Phase 1 scope. (2 Apps, Suite 200 and 201)
Addition of a partition wall and cabinets. (Bldg. 2)
Interior and exterior remodel of existing restaurant - 9,390 sqft interior and 3,624 sqft exterior
EXISTING SPACE NEW TENANT TO INCLUDE NEW WALLS FINISHES FIXTURES AND PAINT. NEW LIGHTING MODIFIED HVAC AND PLUMBING.
Finish Out for Lifetime Fitness for Suite 100 Floor 1
Phase 1- Interior Remodel with Change of Use With Exterior Stair and Landing (39342 SF).
First time finish-out on Floor 30 for a business admin office. Access Control requested.
Interior Remodel of DH4 Train Area To Include Installing an Electric Room for Upgrading Capacity (61130 SF).
+60 more plan review cases in the full issue
+39 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Aug 24–30, 2026.
Start Your Free Trial22 commercial projects in city plan review and 6 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 5 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
BAUS Review - Interior Remodel to Existing Airport Lounge, Scope of Work to Include New Partitions, Doors, Finishes, Ceilings, Lighting, MEP, Sprinkler, and Fire Alarm…
Interior Remodel and Change of Use from Retail to Indoor Sports and Rec Golf Facility with Kitchen and Bar (11,635 SF)
CHANGE OF USE ADMIN OFFICE TO MEDICAL OFFICE PHARMACY with interior remodel. Initial discussions with AFD indicate no hazmat required. Emails included. Structural…
Interior Remodel to Existing Admin Areas to Create Lab Space (655 SF)
Interior Remodel to Existing Office - Sound Room (151,395 SF)
First time finish-out on Floor 30 for a business admin office. Access Control requested.
15 DAY - Cosmetic upgrades addition of monitors lit signage and feature millwork elements within an existing retail tenant. No structural mechanical or plumbing included. - OVA
Interior finish out. (Building 8)
Finish-Out for admin office.
20x40 Pavilion
+17 more plan review cases in the full issue
+1 more issued permit in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Aug 28, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Drywall / Framing) |
|---|---|---|---|---|---|
| Plan Review | Restaurant remodel | Remodel | $10M est. (TDLR filing) | Interior Architects | Medium |
| Plan Review | Change of use to restaurant | Remodel | $250K est. (TDLR filing) | Stantec Consulting Services, Inc | Medium |
| Plan Review | Change of use to medical clinic | Remodel | $410K est. (TDLR filing) | 2727 Exposition Property LLC | Low |
| Plan Review | Lab remodel | Remodel | $444K est. (TDLR filing) | Swinerton Builders Inc | Low |
| Plan Review | Office space remodel | Remodel | $108K est. (TDLR filing) | LJA Engineering | Low |
| Issued Permit | Office space remodel | Remodel | $250K est. (TDLR filing) | Novo Construction | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.