1. School remodel
Minor renovations to include the vent hood replacement and walk in freezer installation within international school cafeteria
No company contact in the City data beyond the permit expediter.
From Monday, Jun 29 through Sunday, Jul 5, 2026, 31 commercial projects entered or moved through City of Austin plan review and 49 commercial building permits were issued. 4 plan review cases and 9 issued permits rate Strong or Medium for HVAC / Mechanical work.
This archived issue is ranked for HVAC / Mechanical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jul 3.
31 commercial projects in city plan review and 49 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Minor renovations to include the vent hood replacement and walk in freezer installation within international school cafeteria
Minor Interior Alteration of a Mercantile Store. No change of use, occupancy or area. no structural work. existing partitions. minor mechanical, electrical, and plumbing…
Existing retail. Removal of approximately 96 sq ft of drywall and insulation and build back. Remediate fungal impacted by drywall, insulation, HVAC equipment, ductwork,…
Proposed new 7381 SF AutoZone retail store, for auto parts and products
Emergency Structural Repairs - Palmer Event Center Garage
New Construction of Elementary School. Building B consist of the Platform Dining Kitchen and Gym. (87818 SF)
Remodel of existing restaurant interior as well as replacing the front elevation storefront. Replacing RTUs and minimum ductwork inside. New light fixtures and millwork are to be installed. No structural changes.
New Construction of a Mixed Use 7-Story Multi-Family Complex. Phase I - 11 Residential Units within Multi-Family Complex. Phase II - Floors 2-5. Phase III - Floors 2-6. New Construction of Parking Garage for Mixed Use 7-Story Multi-Family Complex. New…
Demo roof mechanical existing condensing unit and associated refrigerant piping. Prepare roof penetrations for new piping. Install new curbed outside air intake and install condensing unit. install new exhaust fan Existing office building.
Renovation of one floor of a 4 story office building includes consolidation of the current leased area from approximately 43200 sf full floor use to a partial floor area of approximately 20000 sf. New construction includes demising walls a new mail room two…
+26 more plan review cases in the full issue
+44 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jun 29–Jul 5, 2026.
Start Your Free Trial0 commercial projects in city plan review and 0 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit.
No plan review cases.
No issued permits.
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jul 3, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (HVAC / Mechanical) |
|---|
A preview of 0 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.