Archive · Week of Jun 29–Jul 5, 2026 · Electrical

Austin Electrical Permit Leads: Jun 29–Jul 5, 2026

From Monday, Jun 29 through Sunday, Jul 5, 2026, 31 commercial projects entered or moved through City of Austin plan review and 49 commercial building permits were issued. 2 plan review cases and 11 issued permits rate Strong or Medium for Electrical work.

This archived issue is ranked for Electrical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jul 3.

Austin Permit Leads · Weekly Digest

Week of Jun 29–Jul 5, 2026

31 commercial projects in city plan review and 49 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Week of Jun 29–Jul 5

Issued Permits: Week of Jun 29–Jul 5

1. Retail space remodel

New this week (applied Jun 29)
Remodel · applied Jun 29 · Approved as of Aug 17, 2026 · $300K est. (TDLR filing)
Electrical: Medium fit · score 48

Minor Interior Alteration of a Mercantile Store. No change of use, occupancy or area. no structural work. existing partitions. minor mechanical, electrical, and plumbing…

Owner/Developer: DG Springdale Investments LLC
View on City of Austin AB+C Portal

2. Retail building

New this week (applied Jul 2)
New · applied Jul 2 · Approved as of Oct 8, 2026 · 7,381 SF · $775K
Electrical: Medium fit · score 40

Proposed new 7381 SF AutoZone retail store, for auto parts and products

Applicant: Westwood Professional Services (from 2025 site plan SP-2025-0351C)
Permit expediter: Studio 8 Permit Services
View on City of Austin AB+C Portal

3. Commercial remodel

New this week (applied Jun 29)
Remodel · applied Jun 29 · Approved as of Jul 6, 2026
Electrical: Low fit · score 35

Installation of solar light poles around the existing playground area to increase security. ROY G. GUERRERO COLORADO RIVER METRO PARK - Approved

Owner/Developer: City of Austin
View on City of Austin AB+C Portal

5. Medical clinic remodel

New this week (applied Jul 2)
Remodel · applied Jul 2 · In Review
Electrical: Low fit · score 25

Tenant finish out to convert existing mercantile space into clinic/outpatient (botox). Please reference current site plan exemption request

Civil engineer (site plan): Kimley-Horn (from 2026 site plan SP-2026-0168C)
Permit expediter: Austin Express Permits LLC
View on City of Austin AB+C Portal

1. 2-story fitness center

Permit issued Jul 2
New · 87,818 SF · $25.0M · issued Jul 2
Electrical: Medium fit · score 63

New Construction of Elementary School. Building B consist of the Platform Dining Kitchen and Gym. (87818 SF)

GC or design-builder: Rogers-O'Brien Construction
View on City of Austin AB+C Portal

2. 6-story apartment building with garage

Permit issued Jul 1
New · $79.5M · issued Jul 1
Electrical: Medium fit · score 57

New Construction of a Mixed Use 7-Story Multi-Family Complex. Phase I - 11 Residential Units within Multi-Family Complex. Phase II - Floors 2-5. Phase III - Floors 2-6. New Construction of Parking Garage for Mixed Use 7-Story Multi-Family Complex. New…

GC or design-builder: Ryan Companies US INC
View on City of Austin AB+C Portal

3. Church remodel

Permit issued Jul 2
Remodel · 6,000 SF · $1M est. (TDLR filing) · issued Jul 2
Electrical: Medium fit · score 55

Renovation of an existing church for continued use as a church. Scope is limited to new plumbing ceilings and lighting and new flooring throughout.

GC or design-builder: Capital Constructors Group
View on City of Austin AB+C Portal

4. Restaurant remodel

Permit issued Jun 29
Remodel · 5,500 SF · $200K est. (TDLR filing) · issued Jun 29
Electrical: Medium fit · score 54

Remodel of existing restaurant interior as well as replacing the front elevation storefront. Replacing RTUs and minimum ductwork inside. New light fixtures and millwork are to be installed. No structural changes.

GC or design-builder: LH2G Construction, LLC
View on City of Austin AB+C Portal

5. Warehouse remodel

Permit issued Jun 29
Remodel · 4,937 SF · $500K est. (TDLR filing) · issued Jun 29
Electrical: Medium fit · score 54

Interior alterations to first floor suite within an existing 2-story building. Work includes demolition and construction of partitions doors finishes ceiling lighting power data HVAC utilizing existing systems and modification to existing fire protection to…

GC or design-builder: Trimbuilt Construction, Inc
View on City of Austin AB+C Portal

+26 more plan review cases in the full issue

+44 more issued permits in the full issue

How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for the week of Jun 29–Jul 5, 2026.

Start Your Free Trial
Austin Permit Leads · Daily Recap

Friday, Jul 3, 2026

0 commercial projects in city plan review and 0 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit.

In Plan Review: Fri, Jul 3

Issued Permits: Fri, Jul 3

No plan review cases.

No issued permits.

How fit is scored for electrical work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (labs, data, medical, hotels, grocery and industrial carry the most electrical load) and explicit electrical wording (service upgrade, switchgear, transformer, generator, EV charging, lighting, solar). Strong needs real size (20,000+ SF) or explicit electrical scope; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for Friday, Jul 3, 2026.

Start Your Free Trial

Daily Recap Spreadsheet Preview

Daily Recap Feature
Plan Review or Issued PermitAddress / ProjectWorkValuationCompanyFit (Electrical)

A preview of 0 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.

← Previous WeekAll WeeksNext Week →

Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.