1. Retail building
Proposed new 7381 SF AutoZone retail store, for auto parts and products
Permit expediter: Studio 8 Permit Services
From Monday, Jun 29 through Sunday, Jul 5, 2026, 31 commercial projects entered or moved through City of Austin plan review and 49 commercial building permits were issued. 2 plan review cases and 11 issued permits rate Strong or Medium for Doors & Hardware work.
This archived issue is ranked for Doors & Hardware work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jul 3.
31 commercial projects in city plan review and 49 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Proposed new 7381 SF AutoZone retail store, for auto parts and products
Interior Remodel and Change of Use from Bed and Breakfast to Retail (3,391 SF)
Minor Interior Alteration of a Mercantile Store. No change of use, occupancy or area. no structural work. existing partitions. minor mechanical, electrical, and plumbing…
Interior alteration of approx. 2,050 SF of existing interior space
Re-work of existing office space. No MEP work required. All architectural work and finishes. (2 apps- Building B, Suite 100 and Building D, Suite 100)
New Construction of Elementary School. Building B consist of the Platform Dining Kitchen and Gym. (87818 SF)
Remodel of existing restaurant interior as well as replacing the front elevation storefront. Replacing RTUs and minimum ductwork inside. New light fixtures and millwork are to be installed. No structural changes.
Interior alterations to first floor suite within an existing 2-story building. Work includes demolition and construction of partitions doors finishes ceiling lighting power data HVAC utilizing existing systems and modification to existing fire protection to…
New Construction of a Mixed Use 7-Story Multi-Family Complex. Phase I - 11 Residential Units within Multi-Family Complex. Phase II - Floors 2-5. Phase III - Floors 2-6. New Construction of Parking Garage for Mixed Use 7-Story Multi-Family Complex. New…
Finish out for Light Manufacturing. Scope does not overlap Phase 1 under 2026-028062 PR
+26 more plan review cases in the full issue
+44 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jun 29–Jul 5, 2026.
Start Your Free Trial0 commercial projects in city plan review and 0 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit.
No plan review cases.
No issued permits.
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jul 3, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Doors & Hardware) |
|---|
A preview of 0 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.