Archive · Week of Jun 29–Jul 5, 2026 · Kitchen Equipment

Austin Kitchen Equipment Permit Leads: Jun 29–Jul 5, 2026

From Monday, Jun 29 through Sunday, Jul 5, 2026, 31 commercial projects entered or moved through City of Austin plan review and 49 commercial building permits were issued. 1 plan review case and 3 issued permits rate Strong or Medium for Kitchen Equipment work.

This archived issue is ranked for Kitchen Equipment work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jul 3.

Austin Permit Leads · Weekly Digest

Week of Jun 29–Jul 5, 2026

31 commercial projects in city plan review and 49 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 40 of the issued permits were previously in plan review and are marked, so nothing shows up twice.

In Plan Review: Week of Jun 29–Jul 5

Issued Permits: Week of Jun 29–Jul 5

1. School remodel

New this week (applied Jun 30)
Remodel · applied Jun 30 · Approved as of Aug 19, 2026
Kitchen Equipment: Medium fit · score 55

Minor renovations to include the vent hood replacement and walk in freezer installation within international school cafeteria

Permit expediter: KS Permitting LLC
No company contact in the City data beyond the permit expediter.
View on City of Austin AB+C Portal · Open the case link and check People Details for contact information.

2. Retail building

New this week (applied Jul 2)
New · applied Jul 2 · Approved as of Oct 8, 2026 · 7,381 SF · $775K
Kitchen Equipment: Low fit · score 37

Proposed new 7381 SF AutoZone retail store, for auto parts and products

Applicant: Westwood Professional Services (from 2025 site plan SP-2025-0351C)
Permit expediter: Studio 8 Permit Services
View on City of Austin AB+C Portal

3. Change of use to retail space

New this week (applied Jul 2)
Remodel · applied Jul 2 · Approved and Released as of Sep 28, 2026 · 3,391 SF · $300K est. (TDLR filing)
Kitchen Equipment: Low fit · score 6

Interior Remodel and Change of Use from Bed and Breakfast to Retail (3,391 SF)

GC or design-builder: Warwick Construction, Inc
View on City of Austin AB+C Portal

4. Commercial remodel

Moved to Pending Jun 30
Remodel · applied Mar 19 · Pending
Kitchen Equipment: Low fit · score 0

Window for window replacement. No location or size changes. The is the for entire complex. Please forward her new submission ticket to me

Applicant: Next Level , LLC
View on City of Austin AB+C Portal

1. 2-story fitness center

Permit issued Jul 2
New · 87,818 SF · $25.0M · issued Jul 2
Kitchen Equipment: Strong fit · score 90

New Construction of Elementary School. Building B consist of the Platform Dining Kitchen and Gym. (87818 SF)

GC or design-builder: Rogers-O'Brien Construction
View on City of Austin AB+C Portal

2. Restaurant remodel

Permit issued Jun 29
Remodel · 5,500 SF · $200K est. (TDLR filing) · issued Jun 29
Kitchen Equipment: Medium fit · score 61

Remodel of existing restaurant interior as well as replacing the front elevation storefront. Replacing RTUs and minimum ductwork inside. New light fixtures and millwork are to be installed. No structural changes.

GC or design-builder: LH2G Construction, LLC
View on City of Austin AB+C Portal

4. Commercial remodel

Permit issued Jun 29
Remodel · 188,600 SF · $1.1M · issued Jun 29
Kitchen Equipment: Low fit · score 35

Tear off existing TPO and reskin with new 60 mil TPO

GC or design-builder: Partners Commercial Roofing LLC
View on City of Austin AB+C Portal

5. Commercial remodel

Permit issued Jul 2
Remodel · 1,642 SF · issued Jul 2
Kitchen Equipment: Low fit · score 30

Removing a type 2 vent hood and installing a type 1 vent hood

GC or design-builder: Scratch Restaurants Group
View on City of Austin AB+C Portal

+26 more plan review cases in the full issue

+44 more issued permits in the full issue

How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for the week of Jun 29–Jul 5, 2026.

Start Your Free Trial
Austin Permit Leads · Daily Recap

Friday, Jul 3, 2026

0 commercial projects in city plan review and 0 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit.

In Plan Review: Fri, Jul 3

Issued Permits: Fri, Jul 3

No plan review cases.

No issued permits.

How fit is scored for kitchen and food-service equipment work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit food-service wording (kitchen, restaurant, cafe, bar, hood, walk-in cooler). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.

Showing the top leads in each section for Friday, Jul 3, 2026.

Start Your Free Trial

Daily Recap Spreadsheet Preview

Daily Recap Feature
Plan Review or Issued PermitAddress / ProjectWorkValuationCompanyFit (Kitchen Equipment)

A preview of 0 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.

← Previous WeekAll WeeksNext Week →

Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.