1. 7-story apartment building with garage
New construction of a Seven-Story, Type IB mixed-use multifamily building consisting of 248 dwelling units, a parking garage, indoor tenant amenities, and retail space…
From Monday, Jun 22 through Sunday, Jun 28, 2026, 59 commercial projects entered or moved through City of Austin plan review and 44 commercial building permits were issued. 7 plan review cases and 7 issued permits rate Strong or Medium for HVAC / Mechanical work.
This archived issue is ranked for HVAC / Mechanical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Jun 26.
59 commercial projects in city plan review and 44 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 30 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New construction of a Seven-Story, Type IB mixed-use multifamily building consisting of 248 dwelling units, a parking garage, indoor tenant amenities, and retail space…
New construction of a multifamily development consisting of: Building 1: Four-story apartment building with 176 dwelling units. Building 2: Apartment building with 60…
Tenant Finish Out - A COWORKING SPACE - PRIVATE OFFICES, WORK CAFÉ AND KITCHENETTE, WELLNESS ROOM, CONFERENCE ROOMS, AND OPEN WORK AREAS . MECHANICAL - NEW HVAC.…
CHANGE OF USE from Retail to Fitness Studio - it includes Mechanical, Electrical, and Plumbing. - Pending
Removal of Non-Bearing Interior Partition Walls Only. No Structural, Mechanical, Electrical, Plumbing, Fire Protection, or Occupancy Changes. Conversion of Office into…
Renovations to existing public elementary school including finishes reroofing plumbing fixtures HVAC envelope sealing new theatre curtain at stage and replacement of outdated fire alarm system components. RRISD - Fees Waived
New Construction of Elementary School. Building A consists of Admin Core Classrooms Library Community Art and Music Scopes. (87818 SF)
QT - small interior remodel - selective demolition construction of new partitions ceilings mechanical electrical and plumbing as indicated on drawings at existing office space - OVA
Interior Remodel to Existing Office Space (22320 SF)
Change of Use - Interior alteration of an existing office space into a golf simulator recreation establishment.
+54 more plan review cases in the full issue
+39 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Jun 22–28, 2026.
Start Your Free Trial6 commercial projects in city plan review and 11 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 5 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel to Existing Dining Room Areas. Includes grab & go market area separated by security grilles (12,808 SF)
Interior Remodel to Existing Restaurant (2,015 SF)
Remodel to Suite 100 on Floor 1 for New Food Service Tenant, Suite 200 on Floor 2nd for New Food Service Tenant, and Exterior Improvement for level 3
7 DAY - Interior remodel of existing office building. No TDLR required. No COM Checks Required. Minor electrical work. No Access Control. Arch Sheets. No plumbing scope.…
ePlan Review: Remodel to decommission previous user's tenant items
New Construction of Elementary School. Building A consists of Admin Core Classrooms Library Community Art and Music Scopes. (87818 SF)
White box tenant finish out with new restroom demise walls electrical hvac and plumbing.
Interior Finish-Out to create Office and restroom spaces including the installation of a demising wall -1630 sq ft remodel area.
Interior Remodel to Existing Gun Shop Scope of Work to Include replacement of Existing Porch and Additional Pedestrian Areas are Being Added over Current Parking Spaces (7225 SF).
Interior Remodel of Dental Office for Suite 201
+1 more plan review case in the full issue
+6 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Jun 26, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (HVAC / Mechanical) |
|---|---|---|---|---|---|
| Plan Review | Commercial remodel | Remodel | $520K est. (TDLR filing) | Drenner Group PC | Low |
| Plan Review | Restaurant remodel | Remodel | N/A | Havens Commercial LLC dba Havens Construction | Low |
| Plan Review | Commercial remodel | Remodel | N/A | AR Lucas Construction | Low |
| Plan Review | Office space remodel | Remodel | $3.5M est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $3M est. (TDLR filing) | KFG Cameron Center LLC | Low |
| Issued Permit | 2-story school | New | $25.0M | Rogers-O'Brien Construction | Strong |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.