1. 43-story clubhouse
The mixed-use development will include 5 MF buildings, 2 amenity buildings, 3 Standalone Buildings, and a Public Park. New amenity building (part of a mixed-use…
From Monday, May 11 through Sunday, May 17, 2026, 43 commercial projects entered or moved through City of Austin plan review and 41 commercial building permits were issued. 5 plan review cases and 8 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, May 15.
43 commercial projects in city plan review and 41 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 28 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
The mixed-use development will include 5 MF buildings, 2 amenity buildings, 3 Standalone Buildings, and a Public Park. New amenity building (part of a mixed-use…
QT - Design, furnish, and install 9 retaining walls at existing school - OVA
Fill-in of the existing jacuzzi to be converted into a sidewalk/patio area. - Approved
Parking garage structural repairs
Install Steel Supports in Parking Garage at the lower level ramp drive lane
New Construction of Multi Family Building for Supportive Housing. (110375 SF).
NEW 5 STORY HOTEL 79564 sf
New Construction of Athletic Center to Include New Gym and Fieldhouse (20380 SF).
Big Air Coaster ATR-23
Installation of 4 playground shades.
+38 more plan review cases in the full issue
+36 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of May 11–17, 2026.
Start Your Free Trial7 commercial projects in city plan review and 6 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
QT - Design, furnish, and install 9 retaining walls at existing school - OVA
Existing restaurant. Restore existing wood deck, update ADA access to building, install new ADA ramps, stairs, handrails, and guards. Demolish existing asphalt and…
RE ROOF - layover existing modified bitumen roof with fully adhered TPO roof - OVA
Change of Use from Retail to Pilates Studio (2,175 SF)
Minor interior remodel for existing Medical Office
QT - REMOVE AND REPLACE SIDING - OVA
Phase 2: Interior expansion of EYs existing suite project will include new meeting rooms breakroom demountable walls new finishes: carcarpet acoustical ceiling tile paint tile and light fixtures.
Remodel of existing office spaces for tenant who is expanding into adjacent suites. Access control requested.
Replacement of the existing fire pump and controllers.
7 DAY - FINISH OUT ADMIN OFFICE - OVA
+2 more plan review cases in the full issue
+1 more issued permit in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, May 15, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Plan Review | School | New | $46K | Rosch Company | Medium |
| Plan Review | Restaurant remodel | Remodel | N/A | N/A | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Lindauer Cynthia Trust | Low |
| Plan Review | Change of use to fitness center | Remodel | $500K est. (TDLR filing) | N/A | Low |
| Plan Review | Medical clinic remodel | Remodel | N/A | N/A | Low |
| Issued Permit | Commercial remodel | Remodel | $128K est. (TDLR filing) | Perfection Roofing Company | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.