1. 2-story manufacturing plant
62,435 SF ground up new light manufacturer. Project will be structural steel tilt wall construction with associated site work and interior finish out. & New Dumpster…
Permit expediter: Mercury Permits
From Monday, May 18 through Sunday, May 24, 2026, 47 commercial projects entered or moved through City of Austin plan review and 66 commercial building permits were issued. 4 plan review cases and 13 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, May 22.
47 commercial projects in city plan review and 66 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 46 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
62,435 SF ground up new light manufacturer. Project will be structural steel tilt wall construction with associated site work and interior finish out. & New Dumpster…
Remove and replace existing tea and fountain equipment and chiller. Existing CO2 to remain. There are no modifications to exterior walls, parking, sidewalks or landscape
Remove and replace existing tea and fountain equipment and chiller. Existing CO2 to remain. There is no modification to exterior walls, parking, sidewalks or landscape.…
Interior Remodel and Change of Use From Motel to Restaurant (4,449SF)
Combine two existing tenant spaces and add exterior ramp in existing truck court
Rebuild of full service commercial restaurant with associated site work and landscaping.
Amenity in Ground Swimming Pool with Concrete Deck.
New Construction of 3 Shell Buildings with Mezzanine (13429 SF).
Facade renovation of existing warehouse to shell condition including demolition of interior partitions modification of openings in tilt-wall addition and replacement of storefront and installation of new awnings and planters.
Fill-in of the existing jacuzzi to be converted into a sidewalk/patio area. 2026 016077 DA - Approved
+42 more plan review cases in the full issue
+61 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of May 18–24, 2026.
Start Your Free Trial13 commercial projects in city plan review and 12 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 9 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel and Change of Use From Motel to Restaurant (4,449SF)
We are removing the shingles and replacing them like for like. We are not doing anything structural on the property at all
Replacement OSSF Septic for Parks and Rec Horticultural Staff
We are removing the shingles and replacing them like for like. We are not doing anything structural on the property at all
We are removing the shingles and replacing them like for like. We are not doing anything structural on the property at all
Rebuild of full service commercial restaurant with associated site work and landscaping.
Replacement of neighborhood pool. Demo permit separate 2026 015347 BP
Interior Remodel -Sec 3 Floors 3-4 (38300 SF).
Renovations of existing apartment buildings including interior upgrades to improve accessibility within dwelling units. Work includes replacement of interior finishes doors plumbing fixtures electrical fixtures and devices and HVAC equipment. Exterior work…
Interior Remodel to Existing Retail Store (30970 SF) .
+8 more plan review cases in the full issue
+7 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, May 22, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Plan Review | Change of use to restaurant | Addition and Remodel | $1M est. (TDLR filing) | N/A | Medium |
| Plan Review | Commercial remodel | Remodel | N/A | JRC Inc | Low |
| Plan Review | Commercial remodel | Remodel | $6.5M est. (TDLR filing) | MWM Design Group | Low |
| Plan Review | Commercial remodel | Remodel | N/A | JRC Inc | Low |
| Plan Review | Commercial remodel | Remodel | N/A | JRC Inc | Low |
| Issued Permit | Restaurant | New | $3.4M | Jerry Kachel Builders, Inc | Strong |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.