1. 2-story manufacturing plant
62,435 SF ground up new light manufacturer. Project will be structural steel tilt wall construction with associated site work and interior finish out. & New Dumpster…
Permit expediter: Mercury Permits
From Monday, May 18 through Sunday, May 24, 2026, 47 commercial projects entered or moved through City of Austin plan review and 66 commercial building permits were issued. 0 plan review cases and 0 issued permits rate Strong or Medium for Elevator work.
This archived issue is ranked for Elevator work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, May 22.
47 commercial projects in city plan review and 66 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 46 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
62,435 SF ground up new light manufacturer. Project will be structural steel tilt wall construction with associated site work and interior finish out. & New Dumpster…
First Time Finish out for 5 spec office suites (2,864 SF, 2,097 SF, 7,205 SF) in Building 1 and (3,253 SF, 4,604 SF) in Building 2 (20,022 SF tota
Interior Remodel to Existing Office Space (22,320 SF)
Interior Remodel and Change of Use From Motel to Restaurant (4,449SF)
Change of Use. Return to Shell Not for Occupancy
New Construction of 3 Shell Buildings with Mezzanine (13429 SF).
RE ROOF. REMOVE CURRENT ROOF SYSTEM REPLACE WITH NEW BALLAST ROOF SYSTEM - OVA
Roof recover. No structural changes. Remove existing roof membrane. Install a Carlisle 135-Mil white TPO Fleeceback membrane over the existing insulation mechanically fastened.
Facade renovation of existing warehouse to shell condition including demolition of interior partitions modification of openings in tilt-wall addition and replacement of storefront and installation of new awnings and planters.
CHANGE OF USE RETAIL TO FITNESS CENTER. Interior renovations including mechanical electrical and plumbing
+42 more plan review cases in the full issue
+61 more issued permits in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of May 18–24, 2026.
Start Your Free Trial13 commercial projects in city plan review and 12 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 9 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
Interior Remodel and Change of Use From Motel to Restaurant (4,449SF)
We are removing the shingles and replacing them like for like. We are not doing anything structural on the property at all
Interior remodel to existing admin office Suite 400 to create newly demised Suite 450 and a new corridor and remodel restrooms. (2 Apps)
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric
Replacement OSSF Septic for Parks and Rec Horticultural Staff
Interior Remodel -Sec 3 Floors 3-4 (38300 SF).
Renovations of existing apartment buildings including interior upgrades to improve accessibility within dwelling units. Work includes replacement of interior finishes doors plumbing fixtures electrical fixtures and devices and HVAC equipment. Exterior work…
Interior Remodel to Existing Retail Store (30970 SF) .
Rebuild of full service commercial restaurant with associated site work and landscaping.
Tenant infill of an existing shell building by others. Construction work to include kitchen equipment restrooms mechanical electrical and plumbing.
+8 more plan review cases in the full issue
+7 more issued permits in the full issue
How fit is scored for elevator work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit elevator wording (elevator, lift, escalator). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, May 22, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Elevator) |
|---|---|---|---|---|---|
| Plan Review | Change of use to restaurant | Addition and Remodel | $1M est. (TDLR filing) | N/A | Low |
| Plan Review | Commercial remodel | Remodel | N/A | JRC Inc | Low |
| Plan Review | Office space remodel | Remodel | N/A | N/A | Low |
| Plan Review | Office space remodel | Remodel | N/A | N/A | Low |
| Plan Review | Commercial remodel | Remodel | $6.5M est. (TDLR filing) | MWM Design Group | Low |
| Issued Permit | Commercial remodel | Remodel | $610M est. (TDLR filing) | Turner Construction | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.