1. 43-story clubhouse
The mixed-use development will include 5 MF buildings, 2 amenity buildings, 3 Standalone Buildings, and a Public Park. New amenity building (part of a mixed-use…
From Monday, May 11 through Sunday, May 17, 2026, 43 commercial projects entered or moved through City of Austin plan review and 41 commercial building permits were issued. 2 plan review cases and 8 issued permits rate Strong or Medium for Low-Voltage / Security work.
This archived issue is ranked for Low-Voltage / Security work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, May 15.
43 commercial projects in city plan review and 41 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 28 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
The mixed-use development will include 5 MF buildings, 2 amenity buildings, 3 Standalone Buildings, and a Public Park. New amenity building (part of a mixed-use…
Renovation of one floor of a 4 story office building includes consolidation of the current leased area from approximately 43,200 sf full floor use to a partial floor…
QT - Design, furnish, and install 9 retaining walls at existing school - OVA
Interior Only, Tenant Finish Out of Office Shell
7 day - interior remodel of office space. mostly electrical and mechanical at existing office space - ova
NEW 5 STORY HOTEL 79564 sf
Interior remodel to existing business admin office. Access Control requested.
New Construction of Multi Family Building for Supportive Housing. (110375 SF).
Remodel of existing office spaces for tenant who is expanding into adjacent suites. Access control requested.
Interior Remodel of Existing Office Space. No Change of Use. No Plumbing Scope. Access Control Requested for Suite 215
+38 more plan review cases in the full issue
+36 more issued permits in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of May 11–17, 2026.
Start Your Free Trial7 commercial projects in city plan review and 6 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
QT - Design, furnish, and install 9 retaining walls at existing school - OVA
Minor interior remodel for existing Medical Office
Qt - interior remodel of kitchen and bathroom ****plumbing and electrical permits required.**** at existing multifamily - ova
BAUS- First Time Finish out of New Airline Lounge- (680,000SF)
Change of Use from Retail to Pilates Studio (2,175 SF)
Remodel of existing office spaces for tenant who is expanding into adjacent suites. Access control requested.
7 DAY - FINISH OUT ADMIN OFFICE - OVA
QT - REMOVE AND REPLACE SIDING - OVA
Phase 2: Interior expansion of EYs existing suite project will include new meeting rooms breakroom demountable walls new finishes: carcarpet acoustical ceiling tile paint tile and light fixtures.
Interior finish-out
+2 more plan review cases in the full issue
+1 more issued permit in the full issue
How fit is scored for low-voltage and security work: points for size (square feet), scope (new and shell buildings score highest, small remodels lowest), occupancy (offices, labs, medical and hotels carry the most low-voltage) and explicit low-voltage, access control or cabling wording. Strong needs real size or explicit scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, May 15, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Low-Voltage / Security) |
|---|---|---|---|---|---|
| Plan Review | School | New | $46K | Rosch Company | Low |
| Plan Review | Medical clinic remodel | Remodel | N/A | N/A | Low |
| Plan Review | Apartment building remodel | Remodel | $1.7M est. (TDLR filing) | N/A | Low |
| Plan Review | Restaurant remodel | Remodel | $10M est. (TDLR filing) | Corgan | Low |
| Plan Review | Change of use to fitness center | Remodel | $500K est. (TDLR filing) | N/A | Low |
| Issued Permit | Office space remodel | Remodel | $250K est. (TDLR filing) | Cutting Edge Constructors | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.