1. 43-story clubhouse
The mixed-use development will include 5 MF buildings, 2 amenity buildings, 3 Standalone Buildings, and a Public Park. New amenity building (part of a mixed-use…
From Monday, May 11 through Sunday, May 17, 2026, 43 commercial projects entered or moved through City of Austin plan review and 41 commercial building permits were issued. 6 plan review cases and 17 issued permits rate Strong or Medium for Drywall / Framing work.
This archived issue is ranked for Drywall / Framing work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, May 15.
43 commercial projects in city plan review and 41 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 28 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
The mixed-use development will include 5 MF buildings, 2 amenity buildings, 3 Standalone Buildings, and a Public Park. New amenity building (part of a mixed-use…
Addition of new demising wall to create suite 330 from approx. 1292SF of existing interior space
Commercial Tenant Finish Out to Include New Walls, Ductwork, Building, Electrical, Mechanical, and Plumbing to Create Pilates Addiction for Suite 115
Fire damage repair. Interior drywall and insulation in one room VERIFY NO MECHANICAL WORK VERIFY ELECTRICAL WORK Note to inspector; no Electrical plans just a scope…
QT - Minor renovation work to Live/Work Condo Unit (first owner) to update to lighting, reconfigure small closet, and minor demolition and framing work. At existing…
Suite 110 App. Interior remodel and demising of existing office warehouse suite 106 to create three new suites with three new elec. meters including this suite. The same building already has a suite 106 on the other side. Suite 115 App. Suite 120 App.
Phase 2: Interior expansion of EYs existing suite project will include new meeting rooms breakroom demountable walls new finishes: carcarpet acoustical ceiling tile paint tile and light fixtures.
New Construction of Multi Family Building for Supportive Housing. (110375 SF).
NEW 5 STORY HOTEL 79564 sf
7 DAY - INTERIOR RENOVATION OF AN EXISTING TENANT LEASE SPACE. NO CHANGE TO OCCUPANCY OR USE. THE GENERAL SCOPE OF THE PROJECT INCLUDES ALTERATION TO SELECT AREAS WITH NEW NON-LOAD BEARING PARTITIONS MILLWORK REPLACEMENT OF CIELINGS AND FINISHES. EXISTING MEP…
+38 more plan review cases in the full issue
+36 more issued permits in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of May 11–17, 2026.
Start Your Free Trial7 commercial projects in city plan review and 6 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
QT - Design, furnish, and install 9 retaining walls at existing school - OVA
Minor interior remodel for existing Medical Office
Qt - interior remodel of kitchen and bathroom ****plumbing and electrical permits required.**** at existing multifamily - ova
BAUS- First Time Finish out of New Airline Lounge- (680,000SF)
Existing restaurant. Restore existing wood deck, update ADA access to building, install new ADA ramps, stairs, handrails, and guards. Demolish existing asphalt and…
Phase 2: Interior expansion of EYs existing suite project will include new meeting rooms breakroom demountable walls new finishes: carcarpet acoustical ceiling tile paint tile and light fixtures.
Remodel of existing office spaces for tenant who is expanding into adjacent suites. Access control requested.
QT - REMOVE AND REPLACE SIDING - OVA
7 DAY - FINISH OUT ADMIN OFFICE - OVA
Interior finish-out
+2 more plan review cases in the full issue
+1 more issued permit in the full issue
How fit is scored for drywall and framing work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit drywall wording (drywall, framing, partitions, demising walls, ceilings). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, May 15, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Drywall / Framing) |
|---|---|---|---|---|---|
| Plan Review | School | New | $46K | Rosch Company | Low |
| Plan Review | Medical clinic remodel | Remodel | N/A | N/A | Low |
| Plan Review | Apartment building remodel | Remodel | $1.7M est. (TDLR filing) | N/A | Low |
| Plan Review | Restaurant remodel | Remodel | $10M est. (TDLR filing) | Corgan | Low |
| Plan Review | Restaurant remodel | Remodel | N/A | N/A | Low |
| Issued Permit | Commercial remodel | Remodel | $2.6M est. (TDLR filing) | Rand Construction Corporation | Strong |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.