1. 43-story clubhouse
The mixed-use development will include 5 MF buildings, 2 amenity buildings, 3 Standalone Buildings, and a Public Park. New amenity building (part of a mixed-use…
From Monday, May 11 through Sunday, May 17, 2026, 43 commercial projects entered or moved through City of Austin plan review and 41 commercial building permits were issued. 3 plan review cases and 13 issued permits rate Strong or Medium for Doors & Hardware work.
This archived issue is ranked for Doors & Hardware work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, May 15.
43 commercial projects in city plan review and 41 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 28 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
The mixed-use development will include 5 MF buildings, 2 amenity buildings, 3 Standalone Buildings, and a Public Park. New amenity building (part of a mixed-use…
BAUS Review- Interior Remodel to Existing Mechanic Shop, Scope of Work to Include Installation of New Dedicated Circuits and Roll up Door (2,500 SF)
Interior Remodel to Add Door and Glass Wall for B100
Renovation of one floor of a 4 story office building includes consolidation of the current leased area from approximately 43,200 sf full floor use to a partial floor…
QT - Design, furnish, and install 9 retaining walls at existing school - OVA
New Construction of Multi Family Building for Supportive Housing. (110375 SF).
NEW 5 STORY HOTEL 79564 sf
New Construction of Athletic Center to Include New Gym and Fieldhouse (20380 SF).
Change of Use personal services to Medical - 2880 SF new build-out of existing shell space construction to include: interior walls floors finishes interior doors millwork and light fixtures.
Interior Remodel -Sec 6 Floors 3-4 (37300 SF). Interior Remodel - Sec 2 Floors 3-4. (37200 SF). New Construction of Exterior Equipment Yard (117 450 SF).
+38 more plan review cases in the full issue
+36 more issued permits in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of May 11–17, 2026.
Start Your Free Trial7 commercial projects in city plan review and 6 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 4 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
QT - Design, furnish, and install 9 retaining walls at existing school - OVA
Minor interior remodel for existing Medical Office
Qt - interior remodel of kitchen and bathroom ****plumbing and electrical permits required.**** at existing multifamily - ova
BAUS- First Time Finish out of New Airline Lounge- (680,000SF)
Existing restaurant. Restore existing wood deck, update ADA access to building, install new ADA ramps, stairs, handrails, and guards. Demolish existing asphalt and…
Phase 2: Interior expansion of EYs existing suite project will include new meeting rooms breakroom demountable walls new finishes: carcarpet acoustical ceiling tile paint tile and light fixtures.
Remodel of existing office spaces for tenant who is expanding into adjacent suites. Access control requested.
QT - REMOVE AND REPLACE SIDING - OVA
7 DAY - FINISH OUT ADMIN OFFICE - OVA
Interior finish-out
+2 more plan review cases in the full issue
+1 more issued permit in the full issue
How fit is scored for doors and hardware work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit door wording (doors, hardware, openings, frames, egress). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, May 15, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Doors & Hardware) |
|---|---|---|---|---|---|
| Plan Review | School | New | $46K | Rosch Company | Low |
| Plan Review | Medical clinic remodel | Remodel | N/A | N/A | Low |
| Plan Review | Apartment building remodel | Remodel | $1.7M est. (TDLR filing) | N/A | Low |
| Plan Review | Restaurant remodel | Remodel | $10M est. (TDLR filing) | Corgan | Low |
| Plan Review | Restaurant remodel | Remodel | N/A | N/A | Low |
| Issued Permit | Commercial remodel | Remodel | $2.6M est. (TDLR filing) | Rand Construction Corporation | Medium |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.