1. Multifamily shell building
New Construction of Shell- Scope of Work to Include Multi Family Res. Shell and Tenant Finish out 1st Floor Multifamily and Amenity sp
Permit expediter: KS Permitting LLC
From Monday, Oct 12 through Sunday, Oct 18, 2026, 60 commercial projects entered or moved through City of Austin plan review and 65 commercial building permits were issued. 9 plan review cases and 10 issued permits rate Strong or Medium for HVAC / Mechanical work.
This archived issue is ranked for HVAC / Mechanical work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Oct 16.
60 commercial projects in city plan review and 65 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 46 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of Shell- Scope of Work to Include Multi Family Res. Shell and Tenant Finish out 1st Floor Multifamily and Amenity sp
EPLAN PROJECT: New car dealership (31,587 sqft), New repair garage 1st floor and parking garage 2nd through 5th floor (175,014 sqft), and New gas generator and trash…
Interior remodel of existing restaurant. Scope includes installation of new grease exhaust ductwork connecting existing Type I kitchen hood to roof-mounted exhaust fan…
Install grease trap and kitchen hood and change of ownership in existing restaurant
Install new Roof Top Unit at existing restaurant
CHANGE OF USE from Retail to Fitness Studio - it includes Mechanical Electrical and Plumbing. 2026 074054 DA - Pending
New Construction of Sports Facility Scope of Work to Include Admin Building with Offices Flex Hall and Fitness. New Construction of Sports Facility Covered Field Building - Prefab metal building. Outdoor Covered Field Structure. New Construction of Sports…
Redevelopment of Existing Site. New Construction of 4- Story Affordable Housing to Include 2 Connected Fire Areas and associated site improvements. Fire Area 1: Includes 90 new dwelling units leasing office and learning center. Fire Area 2: Includes 20 new…
Minor Interior Alteration of a Mercantile Store. No change of use occupancy or area. no structural work. existing partitions. minor mechanical electrical and plumbing work. minor storefront work. minor modification to the storefront consisting of painting the…
MINOR INTERIOR ALTERATIONS TO AN EXISTING MERCANTILE TENANT SPACE. NO CHANGE IN USE OCCUPANCY OR BUILDING AREA. EXISTING PARTITIONS. MINOR STRUCTURAL MODIFICATIONS MECHANICAL PLUMBING AND ELECTRICAL WORK. NEW INTERIOR FINISHES AND SALES AREA MILLWORK.…
+55 more plan review cases in the full issue
+60 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Oct 12–18, 2026.
Start Your Free Trial18 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 9 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
EPLAN PROJECT: New car dealership (31,587 sqft), New repair garage 1st floor and parking garage 2nd through 5th floor (175,014 sqft), and New gas generator and trash…
Install new Roof Top Unit at existing restaurant
Minor Electric (Panel), Minor Plumbing (Top Out), Mechanical (Roof Units), Duct work. Replacement of missing drywall, insulation, flooring, painting and finish…
Interior and exterior remodel of existing restaurant - 9,390 sqft interior and 3,624 sqft exterior
This project is a renovation of an existing standalone restaurant. New Exterior Stuccor and EIFS, as well as new signage and painting of existing ACM at the storefront.…
Redevelopment of Existing Site. New Construction of 4- Story Affordable Housing to Include 2 Connected Fire Areas and associated site improvements. Fire Area 1: Includes 90 new dwelling units leasing office and learning center. Fire Area 2: Includes 20 new…
2ND GENERATION TENANT IMPROVEMENT CONVERTING AN (E) WHITE0BOX SPACE INTO A RESTAURANT. THE SCOPE OF WORK INCLUDES A NEW INTERIOR LAYOUT AND ASSOCIATED MECHANICAL ELECTRICAL AND PLUMBING IMPROVEMENTS. NEW A/C TYPE I HOOD AND GREASE TRAP.
Demo roof mechanical existing condensing unit and associated refrigerant piping. Prepare roof penetrations for new piping. Install new curbed outside air intake and install condensing unit. install new exhaust fan.
Floor 3: Replacement of old Cooling Tower on level 3 roof and install of associated accessories. Floor 9: Additional piping to reroute condensate from level above down to level 2 mechanical room.
2026/10/22 - 2026/10/24 | Pop-Up style activation for MINI USA located at 75 Rainey Street which is the Always Something Food Truck location. This event will be focused on building brand awareness for MINI while connecting with a motorsports centric audience.
+13 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for HVAC work: points for size (square feet), scope (new buildings, additions and finish-outs score highest, small remodels lowest), occupancy (labs, medical, hotels, restaurants, schools and assembly carry the most HVAC load) and explicit HVAC wording (RTU, chiller, ductwork, exhaust, VRF, AHU). Strong needs real size (12,000+ SF) or explicit HVAC scope; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Oct 16, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (HVAC / Mechanical) |
|---|---|---|---|---|---|
| Plan Review | Car dealership with repair garage | New | N/A | Omninet Chase Park LLC | Strong |
| Plan Review | Restaurant remodel | Remodel | N/A | The Domain Mall II LLC | Medium |
| Plan Review | Commercial remodel | Remodel | N/A | Culligan Ultrapure Real Estate Inc | Medium |
| Plan Review | Restaurant remodel | Remodel | $4M est. (TDLR filing) | MAE Crockett Partners Ltd | Low |
| Plan Review | Restaurant remodel | Remodel | N/A | Dubs Properties LLC | Low |
| Issued Permit | 4-story apartment building | New | $245.0M | Swinerton Builders Inc | Strong |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.