1. Multifamily shell building
New Construction of Shell- Scope of Work to Include Multi Family Res. Shell and Tenant Finish out 1st Floor Multifamily and Amenity sp
Permit expediter: KS Permitting LLC
From Monday, Oct 12 through Sunday, Oct 18, 2026, 60 commercial projects entered or moved through City of Austin plan review and 65 commercial building permits were issued. 0 plan review cases and 4 issued permits rate Strong or Medium for Demolition work.
This archived issue is ranked for Demolition work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Oct 16.
60 commercial projects in city plan review and 65 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 46 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
New Construction of Shell- Scope of Work to Include Multi Family Res. Shell and Tenant Finish out 1st Floor Multifamily and Amenity sp
EPLAN PROJECT: New car dealership (31,587 sqft), New repair garage 1st floor and parking garage 2nd through 5th floor (175,014 sqft), and New gas generator and trash…
Replacement of damaged beam and joists at back porch balcony. Removal of existing concrete top, replace all damaged materials with like and kind materials
Repair water-damaged balconies, breezeways and corridors; selective demolition, framing/subfloor and concrete repairs, waterproofing/flashing, door thresholds,…
Full demo down to decking, installing 2 layers of 2,2 poly iso insulation. mechanically attached new 60 mil tpo roof system
Interior remodel Area C Interior remodel expanding unit 325 into 350 and 360 AREA C. This not a revision it is its own permit. Demo new partitions. Ceiling finishes. New MEP systems per plan
INTERIOR REMODEL - EXPANDING UNIT 325 INTO 300 310 320 - AREA B -THIS IS NOT A REVISION IT IS ITS OWN PERMIT DEMO-NEW PARTITIONSCEILINGFINISHESNEW MEP SYSTEMS PER PLAN.
Demolish interior partitions of an existing (unused) animal clinic. Proposed use is retail (thrift store). No change to egress footprint or exterior. All structural changes are engineered and drawing set is included.
CHANGE OF USE TO PERSONAL SERVICE with interior remodel demolish non structural interior walls build new walls install new wiring for lights install 8 wall sconces new flooring
TPO Roof Overlay. Adding 1/2 Coverboard and TPO Membrane over Existing Roof. Existing warehouse.
+55 more plan review cases in the full issue
+60 more issued permits in the full issue
How fit is scored for demolition work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit demolition wording (demolition, abatement, removal of existing). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Oct 12–18, 2026.
Start Your Free Trial18 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 9 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
EPLAN PROJECT: New car dealership (31,587 sqft), New repair garage 1st floor and parking garage 2nd through 5th floor (175,014 sqft), and New gas generator and trash…
Interior and exterior remodel of existing restaurant - 9,390 sqft interior and 3,624 sqft exterior
Phase 2 - Build out of business lab in existing tenant space. No access control. No Hazmat component to this phase. No plumbing scope in this phase. No exterior work or…
Minor Electric (Panel), Minor Plumbing (Top Out), Mechanical (Roof Units), Duct work. Replacement of missing drywall, insulation, flooring, painting and finish…
Change of Use - Tenant improvements for a 2,000 sq ft suite to become a Pilates studio. The existing suite was previously used for a liquor store. The scope of work is…
TPO Roof Overlay. Adding 1/2 Coverboard and TPO Membrane over Existing Roof. Existing warehouse.
Redevelopment of Existing Site. New Construction of 4- Story Affordable Housing to Include 2 Connected Fire Areas and associated site improvements. Fire Area 1: Includes 90 new dwelling units leasing office and learning center. Fire Area 2: Includes 20 new…
Demo roof mechanical existing condensing unit and associated refrigerant piping. Prepare roof penetrations for new piping. Install new curbed outside air intake and install condensing unit. install new exhaust fan.
Commercial roof recover: install white TPO membrane over existing roof. No structural changes.
Interior Remodel and Change of Use from Personal Services to Storage for Retail Store (suite 2700) Suite 2700 Scope will Include Interior remodel (16790 SF).
+13 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for demolition work: points for size (square feet), scope (new buildings, shells, additions and finish-outs by trade) and explicit demolition wording (demolition, abatement, removal of existing). Strong needs explicit trade scope or a qualifying job of 10,000+ SF; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Oct 16, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Demolition) |
|---|---|---|---|---|---|
| Plan Review | Car dealership with repair garage | New | N/A | Omninet Chase Park LLC | Low |
| Plan Review | Restaurant remodel | Remodel | $4M est. (TDLR filing) | MAE Crockett Partners Ltd | Low |
| Plan Review | Lab remodel | Remodel | N/A | Karlin McCallen Pass LLC | Low |
| Plan Review | Commercial remodel | Remodel | N/A | Culligan Ultrapure Real Estate Inc | Low |
| Plan Review | Change of use to fitness center | Remodel | $200K est. (TDLR filing) | N/A | Low |
| Issued Permit | Warehouse remodel | Remodel | $686K | Jolly Roofing and Contracting Co LLC | Low |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.