1. Car dealership with repair garage
EPLAN PROJECT: New car dealership (31,587 sqft), New repair garage 1st floor and parking garage 2nd through 5th floor (175,014 sqft), and New gas generator and trash…
Permit expediter: Austin Permit Service Inc
From Monday, Oct 12 through Sunday, Oct 18, 2026, 60 commercial projects entered or moved through City of Austin plan review and 65 commercial building permits were issued. 3 plan review cases and 16 issued permits rate Strong or Medium for Concrete / Foundation work.
This archived issue is ranked for Concrete / Foundation work only, best fits first. Weekly Digest shows the whole week; Daily Recap shows Friday, Oct 16.
60 commercial projects in city plan review and 65 newly issued commercial building permits that week. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. 46 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
EPLAN PROJECT: New car dealership (31,587 sqft), New repair garage 1st floor and parking garage 2nd through 5th floor (175,014 sqft), and New gas generator and trash…
New construction of 2,688 sf fuel canopy (24'-0" x 112'-0") with four (4) multi-product fuel dispensers. work includes canopy structure, foundations, framing,…
New Construction of Shell- Scope of Work to Include Multi Family Res. Shell and Tenant Finish out 1st Floor Multifamily and Amenity sp
Replacement of concrete porch materials on back deck. cosmentic only
Replacement of damaged beam and joists at back porch balcony. Removal of existing concrete top, replace all damaged materials with like and kind materials
Redevelopment of Existing Site. New Construction of 4- Story Affordable Housing to Include 2 Connected Fire Areas and associated site improvements. Fire Area 1: Includes 90 new dwelling units leasing office and learning center. Fire Area 2: Includes 20 new…
New Construction of Sports Facility Scope of Work to Include Admin Building with Offices Flex Hall and Fitness. New Construction of Sports Facility Covered Field Building - Prefab metal building. Outdoor Covered Field Structure. New Construction of Sports…
CHANGE OF USE FROM SFR TO RESTAURANT. Addition remodel of restaurant to include upgrades include repairs to existing foundation and framing addition of 418.8 square feet of new construction with new MEP services new grease interceptor upgraded and relocated…
New Construction of 3 Story Admin Office Building (13000 SF).
Interior remodel of flex office space. Replace back door with overhead door in same opening - no new paving.
+55 more plan review cases in the full issue
+60 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for the week of Oct 12–18, 2026.
Start Your Free Trial18 commercial projects in city plan review and 13 newly issued commercial building permits that day. Best fits first: in each issue, every section opens with up to 10 Strong or Medium fits as full cards, then compact rows for other leads with a company contact or a Medium+ fit; low-fit leads with no company contact are counted at the end of each section. Shown here: the top 5 in each section by ranking, whatever their fit. Every Daily Recap also includes the full spreadsheet with every Plan Review case and issued permit. 9 of the issued permits were previously in plan review and are marked, so nothing shows up twice.
EPLAN PROJECT: New car dealership (31,587 sqft), New repair garage 1st floor and parking garage 2nd through 5th floor (175,014 sqft), and New gas generator and trash…
Interior and exterior remodel of existing restaurant - 9,390 sqft interior and 3,624 sqft exterior
Retroactive building permit for installation of 4 bedroom within existing units. Building Plans on file approved for 4 bedrooms, and align with final inspections and…
Change of use to Personal Improvement Services (dance and pilates)
Change of use to financial services
Redevelopment of Existing Site. New Construction of 4- Story Affordable Housing to Include 2 Connected Fire Areas and associated site improvements. Fire Area 1: Includes 90 new dwelling units leasing office and learning center. Fire Area 2: Includes 20 new…
2026/10/22 - 2026/10/24 | Pop-Up style activation for MINI USA located at 75 Rainey Street which is the Always Something Food Truck location. This event will be focused on building brand awareness for MINI while connecting with a motorsports centric audience.
TPO Roof Overlay. Adding 1/2 Coverboard and TPO Membrane over Existing Roof. Existing warehouse.
Commercial roof recover: install white TPO membrane over existing roof. No structural changes.
Interior Remodel and Change of Use from Personal Services to Storage for Retail Store (suite 2700) Suite 2700 Scope will Include Interior remodel (16790 SF).
+13 more plan review cases in the full issue
+8 more issued permits in the full issue
How fit is scored for concrete and foundation work: points for size (square feet), scope (new buildings, shells and additions score highest, site and paving work next, interior remodels lowest) and explicit concrete wording (foundation, slab, piers, tilt-wall, post-tension, paving, parking garage, sidewalks, retaining walls, site work). Strong needs a new building, shell or addition of 10,000+ SF or explicit concrete scope; interior finish-outs rate Low; small pieces of larger projects are flagged and capped at Medium.
Showing the top leads in each section for Friday, Oct 16, 2026.
Start Your Free Trial| Plan Review or Issued Permit | Address / Project | Work | Valuation | Company | Fit (Concrete / Foundation) |
|---|---|---|---|---|---|
| Plan Review | Car dealership with repair garage | New | N/A | Omninet Chase Park LLC | Strong |
| Plan Review | Restaurant remodel | Remodel | $4M est. (TDLR filing) | MAE Crockett Partners Ltd | Low |
| Plan Review | Commercial remodel | Remodel | N/A | 1108 Nueces Owner LLC | Low |
| Plan Review | Change of use to fitness center | Remodel | N/A | N/A | Low |
| Plan Review | Change of use to financial services | Remodel | N/A | N/A | Low |
| Issued Permit | 4-story apartment building | New | $245.0M | Swinerton Builders Inc | Strong |
A preview of 6 rows and 6 of the 36 columns. Every Daily Recap issue includes the full spreadsheet with every lead, company contacts (never individuals' names), phones, status, dates, fit for each trade and record links.
Data: City of Austin, Development Services Department open data (Plan Review Cases and Issued Construction Permits). Austin Permit Leads is not affiliated with or endorsed by the City of Austin. Always confirm details in the official record.